My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - South Well Field - Water Main Extension Proj No. 117-059B - C & E Excavating, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - South Well Field - Water Main Extension Proj No. 117-059B - C & E Excavating, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 9:21:47 AM
Creation date
9/13/2023 9:21:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 117-059B South Well Field Water Treatment Plant and Distribution <br />System Improvements – Contract B – Watermain <br />Agenda Request – Award Bid <br />DATE: August 29, 2023 <br /> <br />The Board of Public Works opened and read bids at the August 22, 2023, Board of Public Works <br />meeting for the subject project. Three (3) bids were received and the Total Base Bid prices for the <br />contractors ranked as follows: <br /> <br />CONTRACTOR TOTAL BASE BID <br />1. C&E Excavating, Inc. (Elkhart, IN) $1,597,000.00 <br />2. HRP Construction, Inc. (South Bend, IN) $2,271,000.00 <br />3. G.E. Marshall, Inc. (Valparaiso, IN) $2,385,443.87 <br /> <br />Assessment <br />The Bid documents submitted by C&E Excavating, HRP Construction and G.E. Marshall were found <br />to be complete. M/WBE good faith efforts were determined to be acceptable with all contractors <br />providing MBE Utilization and WBE Utilization plans that appear to meet or exceed the MBE Goals <br />(1.5%) and WBE Goals (4.0%) set forth in the contract documents. All contractors submitting bids <br />for this project are considered Responsible Bidders based on the requirements set forth in the <br />Responsible Bidder Ordinance. <br /> <br />Recommendation – Award Bid <br />The Division of Engineering and Division of Water Works recommend award of the contract <br />for Project No. 117-059B South Well Field Water Treatment Plant and Distribution System <br />Improvements – Contract B – Watermain to the lowest, responsive, responsible bidder, C&E <br />Excavating, Inc. (South Bend, IN) for the Base Bid amount of $1,597,000.00. <br /> <br />Account amounts shall be adjusted in DFO to adjust to the Base Bid value for this contract. <br />Funding for this project is provided by TIF Southside Development #1 (Account No. 430-10-102- <br />121-444000). <br /> <br />For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at <br />the Division of Engineering.
The URL can be used to link to this page
Your browser does not support the video tag.