BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: YSB/South Bond Thrive Subdivision Infrastructure Improvements
<br />Project Number: 123-011
<br />For Bids Due: September 12, 2023
<br />Contractor Name: HRP Construction I Inc -
<br />BASE BID
<br />Addandnm All
<br />item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />28
<br />Concrete Curb, 6 Inch
<br />33
<br />LFT
<br />68.50
<br />2,260.50
<br />29 --'
<br />Concrete Sidewalk, 4 Inch
<br />350
<br />SYS
<br />60.00
<br />21,000.00
<br />30
<br />Concrete Curb Ramp
<br />135
<br />SYS
<br />210.00
<br />28,350.00
<br />31
<br />Sodding, Stormwater Ponds
<br />2890
<br />SYS
<br />1150
<br />39,015.00
<br />32
<br />Sodding
<br />-j000
<br />SYS
<br />8.00
<br />5-6,000.00
<br />33
<br />Trees, 2.5 Inch Caliper
<br />92
<br />EA
<br />665.00
<br />61,180.0
<br />34
<br />Storm Sewer Pipe, RCP, 12 Inch
<br />1168
<br />LFT
<br />50.00
<br />58,400.00
<br />35
<br />Storm Sewer Pipe, RCP, 18 Inch
<br />648
<br />LFT
<br />75.00
<br />48,600.00
<br />36
<br />Storm Sewer Pipe, PVC C900, 12 Inch
<br />150
<br />LFT
<br />125.00
<br />18,750.00
<br />37
<br />Concrete End Section, 18 Inch
<br />I
<br />EA
<br />3,500.00
<br />3,500.00
<br />38
<br />Storm Sewer Catch Basin, 30 Inch Dia.
<br />15
<br />EA
<br />---4'-00000
<br />—
<br />60,000.00
<br />30
<br />Storm Sewer Manhole, 48 Inch Dia.
<br />14
<br />EA
<br />7,500.00
<br />105,000.00
<br />40
<br />Sanitary Sewer Pipe, PVC, 8 Inch
<br />2125
<br />LFT
<br />55.00
<br />—116,875.00
<br />41
<br />Sanitary Sewer Laterals, PVC, 6 Inch
<br />31
<br />EA
<br />2,500.00
<br />77,500.0
<br />142
<br />Connection to Existing Sanitary Sewer
<br />Manhole
<br />—
<br />I
<br />EA
<br />10,000.00
<br />10,000.00
<br />43
<br />Sanitary Sewer Manholes, 48 Inch Dia.
<br />13
<br />EA
<br />8,500.00
<br />110,500.00
<br />44
<br />Water Main Pipe, D1, 8 Inch
<br />3460
<br />LFT
<br />110.00
<br />380,600.00
<br />45
<br />Fitting, DI, 45 Degree Bend, 8 Inch
<br />3
<br />EA
<br />1,500,00
<br />4,500,00
<br />46
<br />Fitting, PI, 22.5 Degree Bend, 8 Inch
<br />9
<br />EA
<br />1,500.00
<br />13,500.00
<br />47
<br />Fitting, DI, 11.25 Degree Bend, 8 Inch
<br />4
<br />EA
<br />1,500.00
<br />6,000.00
<br />48
<br />Fitting, DI, 8x8x8 Tee
<br />5
<br />EA
<br />2,300.00
<br />11, 50-0. 00
<br />49
<br />Fitting, DI, 8x8x6 Tee
<br />6
<br />EA
<br />2,200.00
<br />13,200.00
<br />50
<br />Filling, DI, 8x6 Reducer
<br />2
<br />EA
<br />1,500.00
<br />3,000.00
<br />51
<br />Fitting, DI, End Cap, 8 Inch
<br />1
<br />EA
<br />900.00
<br />900.00
<br />52
<br />Gate Valve, DI, 8 Inch
<br />9
<br />—EA
<br />3,500.00
<br />31,500.00
<br />53
<br />Fire Hydrant Assembly
<br />6
<br />EA
<br />11,000.00
<br />66,000.00
<br />64
<br />Water Service, DI, 6 Inch
<br />1
<br />EA
<br />10,000.00
<br />10,000.00
<br />Service, Copper, 2 Inch
<br />EA
<br />7,000.00
<br />2 ,000 0-0
<br />6rWater
<br />:5:65E
<br />Water Service, Copper, 1-1/2 Inch
<br />2
<br />EA
<br />-5,0-0000
<br />10,000.00
<br />Version OWM2021 Contractor's Bid for Public Works - 8
<br />
|