<br />Project Name: YSB/South Bend Thrive Subdivision Infrastructure Improvements
<br />Project Number:
<br />For Bids Due:
<br />Contractor Name:
<br />BASE BID
<br />123-011
<br />September 12, 2023
<br />HKP Construction Inc.
<br />Addanciiim 91
<br />Item
<br />No.
<br />Description
<br />p
<br />Quantity
<br />Unit
<br />— --
<br />Unit Price
<br />Total Amount
<br />1
<br />Maintenance of Traffic
<br />1
<br />LSUM
<br />40,000.00
<br />40,000.00
<br />2
<br />Construction Engineering and Staking
<br />1
<br />LSUM
<br />75,000.00
<br />75,000.00
<br />3
<br />Moblilzation and Demobilization
<br />5% Maximum
<br />1
<br />LSUM
<br />225,000.00
<br />225,000.00
<br />4
<br />Sediment and Erosion Control
<br />1
<br />LSUM
<br />49,624.50
<br />49,624.50
<br />5
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />75,000.00
<br />75,000.00
<br />6
<br />Common Excavation
<br />17000
<br />CYS
<br />35.00
<br />595,000.a
<br />7
<br />Structure Backfill (Undistributed)
<br />100
<br />CYS
<br />50.00
<br />5,000.00
<br />8
<br />Catch Basin / Drywell, Remove
<br />3
<br />EA
<br />900.00
<br />2,700.00
<br />9
<br />Storm Sewer Pipe, Remove
<br />150
<br />LFT
<br />30.00
<br />4,500.00
<br />10
<br />Concrete Curb, Remove
<br />290
<br />LFT
<br />7.00
<br />2,030.00
<br />11
<br />Concrete Approaches and Sidewalk,
<br />Remove
<br />90
<br />SYD
<br />15.00
<br />1,350.00
<br />12
<br />Structure, Strain Poles and Catenary
<br />Wire, Remove
<br />2
<br />EA
<br />7,500.00
<br />15,000.00
<br />13
<br />Structure, Light Poles, Remove
<br />2
<br />EA
<br />3,000.00
<br />6,000.00
<br />14
<br />Structure, Commercial Sign, Remove
<br />1
<br />EA
<br />10,000.00
<br />10,000.00
<br />15
<br />Structure, Swing Set, Remove
<br />1
<br />EA
<br />- 1,000.00
<br />1,000.00
<br />16
<br />Structure, Fence, Remove
<br />377
<br />LFT
<br />8.00
<br />3,016.00
<br />17
<br />Structure, Traffic Sign, Remove
<br />3
<br />EA
<br />150.00
<br />450.00
<br />18
<br />Mining and Removal, Asphalt, Full Depth
<br />5745
<br />SYS
<br />7.50
<br />43,087.50
<br />19
<br />Milling and Removal, Asphalt, 1-1/2"
<br />445
<br />SYS
<br />17.00
<br />7,565.00
<br />20
<br />Compacted Aggregate Base, No. 53
<br />1385
<br />CYS
<br />95.00
<br />131,575.00
<br />21
<br />HMA Pavement, Base, 880 LBS/SYD
<br />195
<br />TONS
<br />100.00
<br />19,500.00
<br />22
<br />HMA Pavement, Base, 440 LBS/SYD
<br />1425
<br />TONS
<br />87.00
<br />123,975.00
<br />23
<br />HMA pavement, Intermediate, 275
<br />LBS/SYD
<br />950
<br />TONS
<br />92.00
<br />87,400.00
<br />24
<br />HMA Pavement, Surface, 165 LBS/SYD
<br />610
<br />TONS
<br />119.00
<br />72,590.00
<br />25
<br />PCCP for Approaches, 9 Inches
<br />350
<br />SYD
<br />90.00
<br />31,500.00
<br />26
<br />PCCP for Approaches, 6 Inches
<br />160
<br />SYD
<br />71.50
<br />10,725.00
<br />27
<br />Concrete Curb and Gutter, 6 Inch
<br />4515
<br />LFT
<br />23.50
<br />106,102.50
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7