Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: YSB/South Bend Thrive Subdivision Infrastructure Improvements <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BASE BID <br />123-011 <br />September 12, 2023 <br />HKP Construction Inc. <br />Addanciiim 91 <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />— -- <br />Unit Price <br />Total Amount <br />1 <br />Maintenance of Traffic <br />1 <br />LSUM <br />40,000.00 <br />40,000.00 <br />2 <br />Construction Engineering and Staking <br />1 <br />LSUM <br />75,000.00 <br />75,000.00 <br />3 <br />Moblilzation and Demobilization <br />5% Maximum <br />1 <br />LSUM <br />225,000.00 <br />225,000.00 <br />4 <br />Sediment and Erosion Control <br />1 <br />LSUM <br />49,624.50 <br />49,624.50 <br />5 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />75,000.00 <br />75,000.00 <br />6 <br />Common Excavation <br />17000 <br />CYS <br />35.00 <br />595,000.a <br />7 <br />Structure Backfill (Undistributed) <br />100 <br />CYS <br />50.00 <br />5,000.00 <br />8 <br />Catch Basin / Drywell, Remove <br />3 <br />EA <br />900.00 <br />2,700.00 <br />9 <br />Storm Sewer Pipe, Remove <br />150 <br />LFT <br />30.00 <br />4,500.00 <br />10 <br />Concrete Curb, Remove <br />290 <br />LFT <br />7.00 <br />2,030.00 <br />11 <br />Concrete Approaches and Sidewalk, <br />Remove <br />90 <br />SYD <br />15.00 <br />1,350.00 <br />12 <br />Structure, Strain Poles and Catenary <br />Wire, Remove <br />2 <br />EA <br />7,500.00 <br />15,000.00 <br />13 <br />Structure, Light Poles, Remove <br />2 <br />EA <br />3,000.00 <br />6,000.00 <br />14 <br />Structure, Commercial Sign, Remove <br />1 <br />EA <br />10,000.00 <br />10,000.00 <br />15 <br />Structure, Swing Set, Remove <br />1 <br />EA <br />- 1,000.00 <br />1,000.00 <br />16 <br />Structure, Fence, Remove <br />377 <br />LFT <br />8.00 <br />3,016.00 <br />17 <br />Structure, Traffic Sign, Remove <br />3 <br />EA <br />150.00 <br />450.00 <br />18 <br />Mining and Removal, Asphalt, Full Depth <br />5745 <br />SYS <br />7.50 <br />43,087.50 <br />19 <br />Milling and Removal, Asphalt, 1-1/2" <br />445 <br />SYS <br />17.00 <br />7,565.00 <br />20 <br />Compacted Aggregate Base, No. 53 <br />1385 <br />CYS <br />95.00 <br />131,575.00 <br />21 <br />HMA Pavement, Base, 880 LBS/SYD <br />195 <br />TONS <br />100.00 <br />19,500.00 <br />22 <br />HMA Pavement, Base, 440 LBS/SYD <br />1425 <br />TONS <br />87.00 <br />123,975.00 <br />23 <br />HMA pavement, Intermediate, 275 <br />LBS/SYD <br />950 <br />TONS <br />92.00 <br />87,400.00 <br />24 <br />HMA Pavement, Surface, 165 LBS/SYD <br />610 <br />TONS <br />119.00 <br />72,590.00 <br />25 <br />PCCP for Approaches, 9 Inches <br />350 <br />SYD <br />90.00 <br />31,500.00 <br />26 <br />PCCP for Approaches, 6 Inches <br />160 <br />SYD <br />71.50 <br />10,725.00 <br />27 <br />Concrete Curb and Gutter, 6 Inch <br />4515 <br />LFT <br />23.50 <br />106,102.50 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />