|
TH
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND�5
<br />'
<br />Project Name:
<br />YSP/South Bend Thrive Subdivision Infrastructure Improvemnts
<br />Project Number:
<br />123-011
<br />For Bids Due:
<br />September 12, 2023
<br />Contractor Name:
<br />Milestone
<br />BASE BID
<br />Addendum #1
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />28
<br />Concrete Curb, 6 Inch
<br />33
<br />LFT
<br />$ 111.70
<br />$ 3,686.10
<br />29
<br />Concrete Sidewalk, 4 Inch
<br />350
<br />SYS
<br />$ 71.70
<br />$ 25,095.00
<br />30
<br />Concrete Curb Ramp
<br />135
<br />SYS
<br />$ 200.00
<br />$ 27,000.00
<br />31
<br />Sodding, Stormwater Ponds
<br />2890
<br />SYS
<br />$ 9.10
<br />$ 26,299.00
<br />32
<br />Sodding
<br />7000
<br />SYS
<br />$ 7.90
<br />$ 55,300.00
<br />33
<br />Trees, 2.5 Inch Caliper
<br />92
<br />EA
<br />$ 665.00
<br />$ 61,180.00
<br />34
<br />Storm Sewer Pipe, RCP, 12 Inch
<br />1168
<br />LFT
<br />$ 62.40
<br />$ 72,883.20
<br />35
<br />Storm Sewer Pipe, RCP, 18 Inch
<br />648
<br />LFT
<br />$ 73.30
<br />$ 47,498.40
<br />36
<br />Storm Sewer Pipe, PVC C900, 12 Inch
<br />150
<br />LFT
<br />$ 83.40
<br />$ 12,510.00
<br />37
<br />Concrete End Section, 18 Inch
<br />1
<br />EA
<br />$ 1,350.00
<br />$ 1,350.00
<br />38
<br />Storm Sewer Catch Basin, 30 Inch Dia.
<br />15
<br />EA
<br />$ 3,610.00
<br />$ 54,150.00
<br />39
<br />Storm Sewer Manhole, 48 Inch Dia.
<br />14
<br />EA
<br />$ 5,300.00
<br />$ 74,200.00
<br />40
<br />Sanitary Sewer Pipe, PVC, 8 Inch
<br />2125
<br />LFT
<br />$ 58.70
<br />$ 124,737.50
<br />41
<br />Sanitary Sewer Laterals, PVC, 6 Inch
<br />31
<br />EA
<br />$ 3,290.00
<br />$ 101,990.00
<br />42
<br />Connection to Existing Sanitary Sewer
<br />Manhole
<br />1
<br />EA
<br />$ 2,830.00
<br />$ 2,830.00
<br />43
<br />Sanitary Sewer Manholes, 48 Inch Dia.
<br />13
<br />EA
<br />$ 6,260.00
<br />$ 81,380.00
<br />44
<br />Water Main Pipe, DI, 8 Inch
<br />3460
<br />LFT
<br />$ 69.61
<br />$ 240,850.60
<br />45
<br />Fitting, DI, 45 Degree Bend, 8 Inch
<br />3
<br />EA
<br />$ 466.50
<br />$ 1,399.50
<br />46
<br />Fitting, DI, 22.5 Degree Bend, 8 Inch
<br />9
<br />EA
<br />$ 462.40
<br />$ 4,161.60
<br />47
<br />Fitting, DI, 11.25 Degree Bend, 8 Inch
<br />4
<br />EA
<br />$ 441.80
<br />$ 1,767.20
<br />48
<br />Fitting, DI, 8x8x8 Tee
<br />5
<br />EA
<br />$ 777.80
<br />$ 3,889.00
<br />49
<br />Fitting, DI, 8x8x6 Tee
<br />6
<br />EA
<br />$ 686.30
<br />$ 4,117.80
<br />50
<br />Fitting, DI, 8x6 Reducer
<br />2
<br />EA
<br />$ 400.70
<br />$ 801.40
<br />51
<br />Fitting, DI, End Cap, 8 Inch
<br />1
<br />EA
<br />$ 265.70
<br />$ 265.70
<br />52
<br />Gate Valve, DI, 8 Inch
<br />9
<br />EA
<br />$ 2,618.50
<br />$ 23,566.50
<br />53
<br />Fire Hydrant Assembly
<br />6
<br />EA
<br />$ 7,015.50
<br />$ 42,093.00
<br />54
<br />Water Service, DI, 6 Inch
<br />1
<br />EA
<br />$ 7,510.00
<br />$ 7,510.00
<br />55
<br />Water Service, Copper, 2 Inch
<br />4
<br />EA
<br />$ 5,460.00
<br />$ 21,840.00
<br />56
<br />Water Service, Copper, 1-1/2 Inch
<br />2
<br />EA
<br />$ 3,587.10
<br />$ 7,174.20
<br />Version 09/29/2021 Contractor's Bid For Public Work - 8
<br />
|