Laserfiche WebLink
TH <br />BID/PROPOSAL <br />CITY OF SOUTH BEND�5 <br />' <br />Project Name: <br />YSP/South Bend Thrive Subdivision Infrastructure Improvemnts <br />Project Number: <br />123-011 <br />For Bids Due: <br />September 12, 2023 <br />Contractor Name: <br />Milestone <br />BASE BID <br />Addendum #1 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />28 <br />Concrete Curb, 6 Inch <br />33 <br />LFT <br />$ 111.70 <br />$ 3,686.10 <br />29 <br />Concrete Sidewalk, 4 Inch <br />350 <br />SYS <br />$ 71.70 <br />$ 25,095.00 <br />30 <br />Concrete Curb Ramp <br />135 <br />SYS <br />$ 200.00 <br />$ 27,000.00 <br />31 <br />Sodding, Stormwater Ponds <br />2890 <br />SYS <br />$ 9.10 <br />$ 26,299.00 <br />32 <br />Sodding <br />7000 <br />SYS <br />$ 7.90 <br />$ 55,300.00 <br />33 <br />Trees, 2.5 Inch Caliper <br />92 <br />EA <br />$ 665.00 <br />$ 61,180.00 <br />34 <br />Storm Sewer Pipe, RCP, 12 Inch <br />1168 <br />LFT <br />$ 62.40 <br />$ 72,883.20 <br />35 <br />Storm Sewer Pipe, RCP, 18 Inch <br />648 <br />LFT <br />$ 73.30 <br />$ 47,498.40 <br />36 <br />Storm Sewer Pipe, PVC C900, 12 Inch <br />150 <br />LFT <br />$ 83.40 <br />$ 12,510.00 <br />37 <br />Concrete End Section, 18 Inch <br />1 <br />EA <br />$ 1,350.00 <br />$ 1,350.00 <br />38 <br />Storm Sewer Catch Basin, 30 Inch Dia. <br />15 <br />EA <br />$ 3,610.00 <br />$ 54,150.00 <br />39 <br />Storm Sewer Manhole, 48 Inch Dia. <br />14 <br />EA <br />$ 5,300.00 <br />$ 74,200.00 <br />40 <br />Sanitary Sewer Pipe, PVC, 8 Inch <br />2125 <br />LFT <br />$ 58.70 <br />$ 124,737.50 <br />41 <br />Sanitary Sewer Laterals, PVC, 6 Inch <br />31 <br />EA <br />$ 3,290.00 <br />$ 101,990.00 <br />42 <br />Connection to Existing Sanitary Sewer <br />Manhole <br />1 <br />EA <br />$ 2,830.00 <br />$ 2,830.00 <br />43 <br />Sanitary Sewer Manholes, 48 Inch Dia. <br />13 <br />EA <br />$ 6,260.00 <br />$ 81,380.00 <br />44 <br />Water Main Pipe, DI, 8 Inch <br />3460 <br />LFT <br />$ 69.61 <br />$ 240,850.60 <br />45 <br />Fitting, DI, 45 Degree Bend, 8 Inch <br />3 <br />EA <br />$ 466.50 <br />$ 1,399.50 <br />46 <br />Fitting, DI, 22.5 Degree Bend, 8 Inch <br />9 <br />EA <br />$ 462.40 <br />$ 4,161.60 <br />47 <br />Fitting, DI, 11.25 Degree Bend, 8 Inch <br />4 <br />EA <br />$ 441.80 <br />$ 1,767.20 <br />48 <br />Fitting, DI, 8x8x8 Tee <br />5 <br />EA <br />$ 777.80 <br />$ 3,889.00 <br />49 <br />Fitting, DI, 8x8x6 Tee <br />6 <br />EA <br />$ 686.30 <br />$ 4,117.80 <br />50 <br />Fitting, DI, 8x6 Reducer <br />2 <br />EA <br />$ 400.70 <br />$ 801.40 <br />51 <br />Fitting, DI, End Cap, 8 Inch <br />1 <br />EA <br />$ 265.70 <br />$ 265.70 <br />52 <br />Gate Valve, DI, 8 Inch <br />9 <br />EA <br />$ 2,618.50 <br />$ 23,566.50 <br />53 <br />Fire Hydrant Assembly <br />6 <br />EA <br />$ 7,015.50 <br />$ 42,093.00 <br />54 <br />Water Service, DI, 6 Inch <br />1 <br />EA <br />$ 7,510.00 <br />$ 7,510.00 <br />55 <br />Water Service, Copper, 2 Inch <br />4 <br />EA <br />$ 5,460.00 <br />$ 21,840.00 <br />56 <br />Water Service, Copper, 1-1/2 Inch <br />2 <br />EA <br />$ 3,587.10 <br />$ 7,174.20 <br />Version 09/29/2021 Contractor's Bid For Public Work - 8 <br />