ram:. F
<br />BID/PROPOSAL ka
<br />CITY OF SOUTH BEND
<br />Project Name: YSP/South Bend Thrive Subdivision Infrastructure Improvemnts
<br />Project Number: 123-011
<br />For Bids Due: September 12, 2023
<br />Contractor Name: Milestone
<br />BASE BID
<br />Addendum #1
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Maintenance of Traffic
<br />1
<br />LSUM
<br />$ 32,500.00
<br />$ 32,500.00
<br />2
<br />Construction Engineering and Staking
<br />1
<br />LSUM
<br />$ 40,750.00
<br />$ 40,750.00
<br />3
<br />Mobilization and Demobilization
<br />(5% Maximum)
<br />1
<br />LSUM
<br />$ 48,900.00
<br />$ 48,900.00
<br />4
<br />Sediment and Erosion Control
<br />1
<br />LSUM
<br />$ 48,400.00
<br />$ 48,400.00
<br />5
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />$ 74,450.00
<br />$ 74,450.00
<br />6
<br />Common Excavation
<br />17000
<br />CYS
<br />$ 12.60
<br />$ 214,200.00
<br />7
<br />Structure Backfill (Undistributed)
<br />100
<br />CYS
<br />$ 53.60
<br />$ 5,360.00
<br />8
<br />Catch Basin / Drywell, Remove
<br />3
<br />EA
<br />$ 860.00
<br />$ 2,580.00
<br />9
<br />Storm Sewer Pipe, Remove
<br />150
<br />LFT
<br />$ 24.60
<br />$ 3,690.00
<br />10
<br />Concrete Curb, Remove
<br />290
<br />LFT
<br />$ 14.30
<br />$ 4,147.00
<br />11
<br />Concrete Approaches and Sidewalk,
<br />Remove
<br />90
<br />SYD
<br />$ 37.50
<br />$ 3,375.00
<br />12
<br />Structure, Strain Poles and Catenary
<br />Wire, Remove
<br />2
<br />EA
<br />$ 2,570.00
<br />$ 5,140.00
<br />13
<br />Structure, Light Poles, Remove
<br />2
<br />EA
<br />$ 200.00
<br />$ 400.00
<br />14
<br />Structure, Commercial Sign, Remove
<br />1
<br />EA
<br />$ 820.00
<br />$ 820.00
<br />15
<br />Structure, Swing Set, Remove
<br />1
<br />EA
<br />$ 3,190.00
<br />$ 3,190.00
<br />16
<br />Structure, Fence, Remove
<br />377
<br />LFT
<br />$ 8.00
<br />$ 3,016.00
<br />17
<br />Structure, Traffic Sign, Remove
<br />3
<br />EA
<br />$ 30.00
<br />$ 90.00
<br />18
<br />Milling and Removal, Asphalt, Full Depth
<br />5745
<br />SYS
<br />$ 4.30
<br />$ 24,703.50
<br />19
<br />Milling and Removal, Asphalt, 1-1/2"
<br />445
<br />SYS
<br />$ 18.10
<br />$ 8,054.50
<br />20
<br />Compacted Aggregate Base, No. 53
<br />1385
<br />CYS
<br />$ 71.80
<br />$ 99,443.00
<br />21
<br />HMA Pavement, Base, 880 LBS/SYD
<br />195
<br />TONS
<br />$ 125.00
<br />$ 24,375.00
<br />22
<br />HMA Pavement, Base, 440 LBS/SYD
<br />1425
<br />TONS
<br />$ 88.00
<br />$ 125,400.00
<br />23
<br />HMA Pavement, Intermediate, 275
<br />LBS/SYD
<br />950
<br />TONS
<br />$ 101.00
<br />$ 95,950.00
<br />24
<br />HMA Pavement, Surface, 165 LBS/SYD
<br />610
<br />TONS
<br />$ 115.00
<br />$ 70,150.00
<br />25
<br />PCCP for Approaches, 9 Inches
<br />350
<br />SYD
<br />$ 123.70
<br />$ 43,295.00
<br />26
<br />PCCP for Approaches, 6 Inches
<br />150
<br />SYD
<br />$ 88.70
<br />$ 13,305.00
<br />27
<br />Concrete Curb and Gutter, 6 Inch
<br />4515
<br />LFT
<br />$ 29.40
<br />$ 132,741.00
<br />Version 09/29/2021 Contractor's Bid For Public Work - 7
<br />
|