Laserfiche WebLink
ram:. F <br />BID/PROPOSAL ka <br />CITY OF SOUTH BEND <br />Project Name: YSP/South Bend Thrive Subdivision Infrastructure Improvemnts <br />Project Number: 123-011 <br />For Bids Due: September 12, 2023 <br />Contractor Name: Milestone <br />BASE BID <br />Addendum #1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Maintenance of Traffic <br />1 <br />LSUM <br />$ 32,500.00 <br />$ 32,500.00 <br />2 <br />Construction Engineering and Staking <br />1 <br />LSUM <br />$ 40,750.00 <br />$ 40,750.00 <br />3 <br />Mobilization and Demobilization <br />(5% Maximum) <br />1 <br />LSUM <br />$ 48,900.00 <br />$ 48,900.00 <br />4 <br />Sediment and Erosion Control <br />1 <br />LSUM <br />$ 48,400.00 <br />$ 48,400.00 <br />5 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />$ 74,450.00 <br />$ 74,450.00 <br />6 <br />Common Excavation <br />17000 <br />CYS <br />$ 12.60 <br />$ 214,200.00 <br />7 <br />Structure Backfill (Undistributed) <br />100 <br />CYS <br />$ 53.60 <br />$ 5,360.00 <br />8 <br />Catch Basin / Drywell, Remove <br />3 <br />EA <br />$ 860.00 <br />$ 2,580.00 <br />9 <br />Storm Sewer Pipe, Remove <br />150 <br />LFT <br />$ 24.60 <br />$ 3,690.00 <br />10 <br />Concrete Curb, Remove <br />290 <br />LFT <br />$ 14.30 <br />$ 4,147.00 <br />11 <br />Concrete Approaches and Sidewalk, <br />Remove <br />90 <br />SYD <br />$ 37.50 <br />$ 3,375.00 <br />12 <br />Structure, Strain Poles and Catenary <br />Wire, Remove <br />2 <br />EA <br />$ 2,570.00 <br />$ 5,140.00 <br />13 <br />Structure, Light Poles, Remove <br />2 <br />EA <br />$ 200.00 <br />$ 400.00 <br />14 <br />Structure, Commercial Sign, Remove <br />1 <br />EA <br />$ 820.00 <br />$ 820.00 <br />15 <br />Structure, Swing Set, Remove <br />1 <br />EA <br />$ 3,190.00 <br />$ 3,190.00 <br />16 <br />Structure, Fence, Remove <br />377 <br />LFT <br />$ 8.00 <br />$ 3,016.00 <br />17 <br />Structure, Traffic Sign, Remove <br />3 <br />EA <br />$ 30.00 <br />$ 90.00 <br />18 <br />Milling and Removal, Asphalt, Full Depth <br />5745 <br />SYS <br />$ 4.30 <br />$ 24,703.50 <br />19 <br />Milling and Removal, Asphalt, 1-1/2" <br />445 <br />SYS <br />$ 18.10 <br />$ 8,054.50 <br />20 <br />Compacted Aggregate Base, No. 53 <br />1385 <br />CYS <br />$ 71.80 <br />$ 99,443.00 <br />21 <br />HMA Pavement, Base, 880 LBS/SYD <br />195 <br />TONS <br />$ 125.00 <br />$ 24,375.00 <br />22 <br />HMA Pavement, Base, 440 LBS/SYD <br />1425 <br />TONS <br />$ 88.00 <br />$ 125,400.00 <br />23 <br />HMA Pavement, Intermediate, 275 <br />LBS/SYD <br />950 <br />TONS <br />$ 101.00 <br />$ 95,950.00 <br />24 <br />HMA Pavement, Surface, 165 LBS/SYD <br />610 <br />TONS <br />$ 115.00 <br />$ 70,150.00 <br />25 <br />PCCP for Approaches, 9 Inches <br />350 <br />SYD <br />$ 123.70 <br />$ 43,295.00 <br />26 <br />PCCP for Approaches, 6 Inches <br />150 <br />SYD <br />$ 88.70 <br />$ 13,305.00 <br />27 <br />Concrete Curb and Gutter, 6 Inch <br />4515 <br />LFT <br />$ 29.40 <br />$ 132,741.00 <br />Version 09/29/2021 Contractor's Bid For Public Work - 7 <br />