My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/12/13 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
02/12/13 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:15:15 PM
Creation date
2/26/2013 3:48:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
2/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />FEBRUARY 12 2013 26 <br />:o <br />Base Bid <br />$3,086,592.00 <br />Alternate 1 <br />$369,224.00 <br />Alternate 2 <br />$54,312.00 <br />Alternate 3 <br />$36,676.00 <br />Alternate 4 <br />$153,374.00 <br />Total <br />$3,699,178.00 <br />GRAND RIVER CONSTRUCTION INC. <br />5025 40t Avenue <br />Hudsonville, Michigan 49464 <br />Bid was signed by: Mr. William Kersaan <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Five percent (5%) Bid Bond was submitted <br />Base Bid <br />$31,118,808.00 <br />Alternate 1 <br />$330,885.00 <br />Alternate 2 <br />$52,896.00 <br />Alternate 3 1 <br />$35,724.00 <br />Alternate 4 <br />$154,144.00 <br />Total <br />$3,692,457.00 <br />Upon a motion made by Mr. Mecham, seconded by Ms. Roos and carried, the above bids were <br />referred to Water Works for review and recommendation. <br />OPENING OF BIDS — MAIN STREET/LAFAYETTE BOULEVARD CONNECTOR -- <br />PROJECT NO. 110-058B SSDA TIF <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South. Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />RIETH-RILEY CONSTRUCTION CO. INC. <br />PO Box 1775 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Christopher Wienkauf <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Five percent (5%) Bid Bond was submitted <br />13000 <br />Base Bid <br />$3,087,667.99 <br />Alternate 1 <br />$216,938.50 <br />Alternate 2 <br />$435,261.97 <br />Total Base Bid and Alternate 1 <br />$3,304,606.49 <br />Total Base Bid and Alternate 2 and Alternate 2 <br />$3,739,868.46 <br />PHEND & BROWN, INC. <br />PO Box 150 <br />Milford, Indiana 46542 <br />Bid was signed by: Mr. Daniel Brown <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Five percent (5%) Bid Bond was submitted <br />an <br />
The URL can be used to link to this page
Your browser does not support the video tag.