My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Odor Control Study & Hydrogen Sulfide Eval. – Webster Environmental Assoc., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Odor Control Study & Hydrogen Sulfide Eval. – Webster Environmental Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:23:22 PM
Creation date
8/22/2023 2:23:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III. Schedule and Fee <br /> <br />The Project Manager will be Jim Ross, P.E., who is a registered P.E. in Indiana. WEA <br />proposes a Lump Sum, Not-to-Exceed fee of $23,500, including professional time and all <br />expenses as shown in the table below. <br /> <br /> <br />Task Name Task <br />Duration <br />Fee <br />Conduct Information Review 1 week $2,200 <br />Develop Testing Plan 1 week $2,200 <br />City Testing (not a WEA Task) 2-4 weeks $0 <br />Conduct Screening of Alternatives 2 weeks $4,600 <br />Develop Draft and Final Report 4 weeks $6,600 <br />Conduct Site Visits 0 weeks $7,900 <br />Total 10-12 weeks $23,500 <br /> <br />IV. Exceptions <br />This scope excludes the following: <br />• Anything not explicitly stated in the scope <br />• Evaluation of air treatment odor control systems <br />• Field testing <br />• Pilot testing <br />• Design services
The URL can be used to link to this page
Your browser does not support the video tag.