Laserfiche WebLink
Deliverable: Testing Plan for City <br /> <br />C. Conduct Preliminary Screening of Alternatives <br /> <br />1. Using the results of the testing, perform an evaluation of alternatives based on <br />projected dosages and costs which shall include the following: <br /> <br />1. Calcium nitrate dosage adjustments for the existing feed systems <br />2. Additional calcium nitrate feed systems <br />3. Other chemical feed systems options such as magnesium hydroxide, <br />oxygen, and ferric chloride (iron). <br /> <br />2. Based on the preliminary screening, select viable alternatives for discussion <br />with the City. <br />3. Conduct virtual meeting with the City to discuss alternatives and obtain input. <br /> <br />Deliverable: Preliminary Screening of Alternatives Results (typically a one- <br />page table) <br /> <br />D. Develop Draft and Final Report <br /> <br />1. Develop recommendations based on the preliminary screening of alternatives <br />and input from the City <br />2. Develop capital and operating costs for the recommended alternative(s). <br />3. Recommend either a demonstration project of the chemical(s) or just select one <br />based on the evaluation. This choice will be based on discussions with the City. <br />4. Prepare a draft and final report. <br /> <br />Deliverable: Draft and Final Report <br /> <br />E. Conduct Site Visits <br /> <br />1. WEA shall conduct two (2), one-day site visits during the project. These site <br />visits will be used as needed. <br /> <br /> <br />