My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - 2022 Contractor Paving, Round III Proj No. 122-048 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 3 - 2022 Contractor Paving, Round III Proj No. 122-048 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:18:53 PM
Creation date
8/22/2023 2:18:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 122-048 8/22/2023 <br />2022 Contractor Paving, Round 3 <br />Line Item Qty Unit Price Total <br />Additional Loops 9 EA $2,100.00 $18,900.00 <br />Additional Joint Adhesive 16907 EA $1.00 $16,907.00 <br />Additional 3" Milling 9554 SY $3.82 $36,496.28 <br />HMA Overruns 1 Various $45,470.40 $45,470.40 <br />$0.00 <br />CO Total =$117,773.68 <br />Change Order #3 <br />Notes <br />Scope: Added HMA for changed milling depths, and overruns on planned <br />quantities for the different HMA types. <br />Scope: Changed milling depth from Ridgedale to Donmoyer to match the <br />northern and southern legs for a better overal product. <br />Scope: Additional lane loops were needed to match existing conditions at <br />several intersections. <br />Scope: Additional lane pulls on the paver required more joint adhesive.
The URL can be used to link to this page
Your browser does not support the video tag.