My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 1321 East Wayne Street South_COA 2023-0717A
sbend
>
Public
>
Historic Preservation
>
2023
>
August
>
1. 1321 East Wayne Street South_COA 2023-0717A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 11:54:58 AM
Creation date
8/14/2023 11:54:21 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1321 East Wayne Street South
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Name: Tom Keller Date: 7-14-23 <br />Address: 1321 Wayne St. S <br />South Bend, IN 46615 <br />Phone: <br />RE: Roof Quote <br />Millwood Roofing and Construction Inc. propose to complete the following: <br />Scope of Roof Work: <br />•Tear off existing roof material and dispose/recycle of all trash and debris <br />•Keep the property clean, trash picked up, and broom swept each day before leaving using “New <br />Roof No Mess” procedures <br />•Inspect the roof deck and make repairs as needed at an additional cost of $5.00/SF <br />•Install new aluminum roof edging <br />•Apply ice and water shield at the eaves and around roof penetrations (soil pipes, chimneys, etc.) <br />•Replace soil/vent pipe flashings <br />•Replace chimney flashings <br />•Re-flash all wall/roof intersections <br />•Install synthetic underlayment <br />•Install continuous ridge vent <br />•Install new Certainteed Landmark architectural shingles in “Georgetown Gray” <br />•Install new matching Certainteed Shadow Ridge ridge-cap shingles <br />•Fasten shingles using 4 nails per shingle <br />•Complete and thorough cleanup of the property <br />Labor and Material Total $ <br />Adjusted Price if OSB Overlay is Needed: <br />Labor and Material Total $ <br />Options: <br />•Investigate ice damming/potential insulation issue on the back side of house on a time and <br />material basis <br />•Replace existing soffit with vented soffit and install ventilation shoots at 2 stretches of eave <br />(portion of house that was added on) <br />Labor and Material Total $2,800.00 <br />•Install one new Provia Endure 2-Lite Slider Window with Internal Blinds <br />Labor and Material Total $2,106.00 <br />•Replace existing aluminum siding with new Certainteed Vinyl Cedar Impressions Double 7” <br />Straight Edge Perfection Shingles 3G and necessary trims in the color “Flagstone Gray” <br />Labor and Material Total $6,222.00
The URL can be used to link to this page
Your browser does not support the video tag.