My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Selection Start Contract Negotiation - WWTP CSO Tank RFQ – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Selection Start Contract Negotiation - WWTP CSO Tank RFQ – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:15:53 PM
Creation date
8/8/2023 1:15:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Area Percentage Score Bowen Kokosing <br />Background and Qualifications 5% 0 - 5 5.0 4.0 <br />1.Provider history <br />2. Company contact information <br />3. Qualifications of personnel assigned to project <br />4. Financial report and IC certifications <br />5. Professional Engineers and services provided <br />References 20% 0 - 20 18.0 16.0 <br />1. Guaranteed savings contracts in Indiana <br />2. Indiana water/sewer GSC completed <br />Technical Approach 25% 0 - 25 23.3 22.0 <br />1. Responder understanding of scope <br />2. Firms technical ability on WWTP and CSO work <br />3. Team construction approach <br />4. Proposed schedule <br />5. Collaboration experience with engineering firms <br />Project Implementation 20% 0 - 20 18.3 17.0 <br />1. Demonstration to perform at least 20% of work <br />2. Project Management approach <br />3. General contractor team members <br />4. Proposed subcontractors <br />5. Plan for utilization of minorty or women owned buisnesses <br />Financial Approach 20% 0 - 20 19.3 17.5 <br />1. Description of procurement plan for best prices <br />2. History with adherence to GMP <br />3. Open book policy/procedures <br />4. Bonding capacity <br />Guarantee Management 10% 0 - 10 10.0 10.0 <br />1. Procedure for guarantee management <br />2. Methodology to compute savings baseline <br />3. Guarantee management cost, schedule, report <br />4. Description of savings estimate methodology <br />5. O&M estimate description and savings <br />6. Future capital savings estimate and incorporation <br />Total 100% 100 93.7 86.5 <br />Comments <br />Comments <br />Comments <br />Comments <br />Comments <br />CITY OF SOUTH BEND, INDIANA <br />SOUTH BEND WWTP CSO EQ BASIN PROJECT <br />GUARANTEED SAVINGS CONTRACT <br />STATEMENT OF QUALIFICATIONS <br />COSB SCORE SHEET <br />Comments <br />Instructions to Reviewer: <br />1. Read through score sheet, including subject areas and specific items for consideration <br />2. As reading through Statements of Qualifications, take notes in light blue boxes for each respondent <br />3. For each section provide score (within provided range) in light green boxes <br />4. Add written comments/questions in yellow boxes <br />5. Scores will automatically sum by each respondent, with overall scores ranked (green highest, red lowest)
The URL can be used to link to this page
Your browser does not support the video tag.