§ 3.3.5 Based on the Owner's approval of the preliminary design, the Architect shall prepare Schematic Design <br />Documents for Construction Manager's review and the Owner's approval. The Schematic Design Documents shall <br />consist of drawings and other documents including a site plan, if appropriate, and preliminary building plans, <br />sections and elevations; and may include some combination of study models, perspective sketches, or digital <br />representations. Preliminary selections of major building systems and construction materials shall be noted on the <br />drawings or described in writing. The digital representations will include up to (4) final non-plemorealistic <br />renderings with semi -accurate lighting and representational entourage in addition to lesser detailed renderings <br />similar to those in the Concept Design Package. <br />§ 3.3.5.1 The Architect shall consider sustainable design alternatives, such as material choices and building <br />orientation, together with other considerations based on program and aesthetics, in developing a design that is <br />consistent with the Owner's program, schedule and budget for the Cost of the Work. The Owner may obtain more <br />advanced sustainable design services as a Supplemental Service under Section 4.1. <br />§ 3.3.5.2 The Architect shall consider with the Owner and the Construction Manager the value of alternative <br />materials, building systems and equipment, together with other considerations based on program and aesthetics, in <br />developing a design for the Project that is consistent with the Owner's program, schedule, and budget for the Cost of <br />the Work. <br />§ 3.3.6 The Architect shall submit the Schematic Design Documents to the Owner and the Construction Manager. <br />The Architect shall meet with the Construction Manager to review the Schematic Design Documents. <br />§ 3.3.7 Upon receipt of the Construction Manager's review comments and cost estimate at the conclusion of the <br />Schematic Design Phase, the Architect shall take action as required under Section 6.4, and request the Owner's <br />approval of the Schematic Design Documents. If revisions to the Schematic Design Documents are required to <br />comply with the Owner's budget for the Cost of the Work at the conclusion of the Schematic Design Phase, the <br />Architect shall incorporate the required revisions in the Design Development Phase. <br />§ 3.3.8 In the further development of the Drawings and Specifications during this and subsequent phases of design, <br />the Architect shall be entitled to rely on the accuracy of the estimates of the Cost of the Work, which are to be <br />provided by the Construction Manager under the Construction Manager's agreement with the Owner. <br />(Paragraphs Deleted) <br />(Paragraphs Deleted) <br />ARTICLE4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br />§ 4.1 Supplemental Services <br />§ 4.1.1 The services listed below are not included in Basic Services but may be required for the Project. The <br />Architect shall provide the listed Supplemental Services only if specifically designated in the table below as the <br />Architect's responsibility, and the Owner shall compensate the Architect as provided in Section 11.2. Unless <br />otherwise specifically addressed in this Agreement, if neither the Owner nor the Architect is designated, the parties <br />agree that the listed Supplemental Service is not being provided for the Project. <br />hat AM Docamente133 2019. CopyiieM®2014, and <br />use only, and my only not used In eccdmenos with the Al, <br />rum. <br />(3a9ADA46) <br />