Laserfiche WebLink
South Bend Cubs Stadium Conceptual Estimate 9_20_22 <br />Grab & Go/ <br />Uppper <br />LF Building/ <br />CIF Improve- <br />Splash Pad/ New Seating New Seating New Seating <br />DESCRIPTION <br />:: QUANTITY <br />UNIT $ <br />TOTAL <br />Press/Seat <br />Level/ <br />Bridge <br />ments <br />Kids Area Product <br />1 <br />Product - 2 <br />Product 3 <br />Opt 1 <br />Roof/Club <br />07 41 00 MANUFACTURED ROOF PANELS <br />Metal Roof <br />30,657 SF <br />35.00 <br />1,072,998 <br />923,751 <br />114,857 <br />34,391 <br />1,072,998 <br />0 <br />923,751 <br />114,857 <br />34,391 <br />0 <br />0 <br />0 <br />0' <br />07 50 00 MEMBRANE ROOFING <br />TPO Roof/Insulation <br />13,335 SF <br />18.00 <br />240,022 <br />4,987 <br />31,218 <br />157,124 <br />46,693 <br />Re -Roof at Pepsi Club <br />3,130 SF <br />19.00 <br />59,478 <br />59,478 <br />299,500 <br />4,987 <br />90,696 <br />157,124 <br />46,693 <br />0 <br />0 <br />0 <br />0' <br />07 60 00 SHEET METAL FLASHING AND TRIM <br />Coping <br />1,295 LF <br />45.00 <br />58,282 <br />3,086 <br />24,867 <br />20,994 <br />9,335 <br />Counter Flashing <br />524 LF <br />25.00 <br />13,101 <br />5,204 <br />6,411 <br />1,485 <br />Edge Flashing/Fascia <br />1,694 LF <br />50.00 <br />84,723 <br />58,398 <br />21,756 <br />4,569 <br />Gutter <br />562 LF <br />20.00 <br />11,245 <br />11,245 <br />Downspouts <br />510 LF <br />16.00 <br />8,160 <br />480 <br />6,720 <br />960 <br />Roof Scuppers <br />10 EA <br />400.00 <br />4,000 <br />800 <br />1,600 <br />1,600 <br />Metal Soffit <br />3,163 SF <br />25.00 <br />79,070 <br />55,239 <br />23,831 <br />258,581 <br />4,366 <br />108,034 <br />104,400 <br />41,782 <br />0 <br />0 <br />0 <br />0 <br />07 72 00 ROOF ACCESSORIES <br />Roof Pavers <br />7,450 SF <br />15.00 <br />111,752 <br />111,752 <br />111,752 <br />0 <br />0 <br />111,752 <br />0 <br />0 <br />0 <br />0 <br />0' <br />08 11 00 STEEL DOOR & FRAMES <br />Exterior HM Door - Insulated <br />15 EA <br />500.00 <br />7,500 <br />4,000 <br />1,500 <br />2,000 <br />HMFrame 3x7 <br />11 EA <br />390.00 <br />4,290 <br />1,560 <br />1,170 <br />1,560 <br />HM Frame 6'x7' <br />2 EA <br />430.00 <br />860 <br />860 <br />12,650 <br />0 <br />6,420 <br />2,670 <br />3,560 <br />0 <br />0 <br />0 <br />0' <br />08 33 23 OVERHEAD COILING DOORS <br />Coiling Concession Door <br />59 LF <br />400.00 <br />23,784 <br />23,784 <br />23,784 <br />0 <br />0 <br />0 <br />23,784 <br />0 <br />0 <br />0 <br />0 <br />08 41 00 ALUMINUM ENTRANCES AND STOREFRONTS <br />Aluminum Storefront <br />1,170 SF <br />65.00 <br />76,078 <br />76,078 <br />Alum Storefront w/Impact Resistant Glass <br />8,294 SF <br />165.00 <br />1,368,458 <br />1,054,305 <br />314,153 <br />Nanawall w/Impact Resistant Glass <br />4,167 SF <br />235.00 <br />979,326 <br />979,326 <br />Ticket Window <br />2 EA <br />4,000.00 <br />8,000 <br />8,000 <br />Aluminum Entrance Double Door & Frame <br />28 EA <br />5,800.00 <br />162,400 <br />104,400 <br />58,000 <br />2,594,261 <br />0 <br />2,138,031 <br />456,231 <br />0 <br />0 <br />0 <br />0 <br />0' <br />08 71 00 DOOR HARDWARE <br />Door Hardware ALLOW <br />15 EA <br />1,200.00 <br />18,000 <br />9,600 <br />3,600 <br />4,800 <br />18,000 <br />0 <br />9,600 <br />3,600 <br />4,800 <br />0 <br />0 <br />0 <br />0' <br />Page 4 of 9 <br />