Laserfiche WebLink
UNIT PRICE EXTENSION UNIT PRICE EXTENSION High Low Average UNIT PRICE EXTENSION <br />CITY OF SOUTH BEND, INDIANA <br />CITY OF SOUTH BEND BOARD OF PUBLIC WORKS <br />ANGELA BOULEVARD IMPROVEMENTS <br />PROJECT NO. 122-059 <br />BIDS OPENING: 6/13/2023 <br /> CONTRACTOR UNIT PRICES ENGINEER'S ESTIMATEITEM <br />NO.DESCRIPTION QUANTITY UNIT <br />RIETH RILEY CONSTRUCTION <br />COMPANY, INC. <br />MILESTONE CONTRACTORS <br />NORTH, INC. <br />42 LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN. 6889 LFT $ 1.05 $ 7,233.45 $ 1.05 $ 7,233.45 $ 1.05 $ 1.05 $ 1.05 $ 2.00 $ 13,778.00 <br />43 GROOVING FOR PAVEMENT MARKINGS 1752 LFT $ 0.68 $ 1,191.36 $ 0.68 $ 1,191.36 $ 0.68 $ 0.68 $ 0.68 $ 2.00 $ 3,504.00 <br />44 TEMPORARY PAVEMENT MARKING, 4 IN. 4640 LFT $ 1.58 $ 7,331.20 $ 0.36 $ 1,670.40 $ 1.58 $ 0.36 $ 0.97 $ 1.00 $ 4,640.00 <br />45 PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC LANE INDICATION ARROW 27 EACH $ 188.78 $ 5,097.06 $ 188.00 $ 5,076.00 $ 188.78 $ 188.00 $ 188.39 $ 188.00 $ 5,076.00 <br />46 CONSTRUCTION SIGN, A 21 EACH $ 201.83 $ 4,238.43 $ 201.00 $ 4,221.00 $ 201.83 $ 201.00 $ 201.42 $ 201.00 $ 4,221.00 <br />47 CONSTRUCTION SIGN, B 16 EACH $ 135.56 $ 2,168.96 $ 135.00 $ 2,160.00 $ 135.56 $ 135.00 $ 135.28 $ 135.00 $ 2,160.00 <br />48 CONSTRUCTION SIGN, D 8 EACH $ 165.68 $ 1,325.44 $ 165.00 $ 1,320.00 $ 165.68 $ 165.00 $ 165.34 $ 165.00 $ 1,320.00 <br />49 DETOUR ROUTE MARKER ASSEMBLY 34 EACH $ 141.58 $ 4,813.72 $ 141.00 $ 4,794.00 $ 141.58 $ 141.00 $ 141.29 $ 141.00 $ 4,794.00 <br />50 TEMPORARY PEDESTRIAN CHANNELIZER 168 LFT $ 49.03 $ 8,237.04 $ 39.00 $ 6,552.00 $ 49.03 $ 39.00 $ 44.02 $ 50.00 $ 8,400.00 <br />51 SIGN POST, SQUARE, TYPE 1, REINFORCED <br />ANCHOR BASE 210 LFT $ 15.06 $ 3,162.60 $ 15.00 $ 3,150.00 $ 15.06 $ 15.00 $ 15.03 $ 15.00 $ 3,150.00 <br />52 SIGN, SHEET, WITH LEGEND, 0.080 IN. 66 SFT $ 14.06 $ 927.96 $ 14.00 $ 924.00 $ 14.06 $ 14.00 $ 14.03 $ 14.00 $ 924.00 <br />53 INSTALL SHEET SIGN 3 EACH $ 150.62 $ 451.86 $ 150.00 $ 450.00 $ 150.62 $ 150.00 $ 150.31 $ 180.00 $ 540.00 <br />54 TRAFFIC SIGNAL EQUIPMENT, REMOVE 3 EACH $ 7,028.95 $ 21,086.85 $ 7,000.00 $ 21,000.00 $ 7,028.95 $ 7,000.00 $ 7,014.48 $ 750.00 $ 2,250.00 <br />55 SIGNAL POLE, STEEL STRAIN, 36 FT 4 EACH $ 14,559.97 $ 58,239.88 $ 14,500.00 $ 58,000.00 $ 14,559.97 $ 14,500.00 $ 14,529.99 $ 10,500.00 $ 42,000.00 <br />56 SIGNAL POLE FOUNDATION, 36 IN. X 144 IN. 4 EACH $ 3,012.41 $ 12,049.64 $ 3,000.00 $ 12,000.00 $ 3,012.41 $ 3,000.00 $ 3,006.21 $ 9,500.00 $ 38,000.00 <br />57 HANDHOLE, SIGNAL, TYPE 1 5 EACH $ 1,506.20 $ 7,531.00 $ 1,500.00 $ 7,500.00 $ 1,506.20 $ 1,500.00 $ 1,503.10 $ 1,189.00 $ 5,945.00 <br />58 CONDUIT, STEEL, GALVANIZED, 2 IN. 498 LFT $ 52.22 $ 26,005.56 $ 52.00 $ 25,896.00 $ 52.22 $ 52.00 $ 52.11 $ 52.00 $ 25,896.00 <br />59 CONTROLLER AND CABINET, TS2 1 EACH $ 27,111.66 $ 27,111.66 $ 27,000.00 $ 27,000.00 $ 27,111.66 $ 27,000.00 $ 27,055.83 $ 23,500.00 $ 23,500.00 <br />60 CONTROLLER CABINET FOUNDATION, P1 1 EACH $ 753.10 $ 753.10 $ 750.00 $ 750.00 $ 753.10 $ 750.00 $ 751.55 $ 750.00 $ 750.00 <br />61 TRAFFIC SIGNAL HEAD, 3 SECTION, 12 IN. 8 EACH $ 1,004.14 $ 8,033.12 $ 1,000.00 $ 8,000.00 $ 1,004.14 $ 1,000.00 $ 1,002.07 $ 1,000.00 $ 8,000.00 <br />62 TRAFFIC SIGNAL HEAD, 4 SECTION, 12 IN. 3 EACH $ 1,104.55 $ 3,313.65 $ 1,100.00 $ 3,300.00 $ 1,104.55 $ 1,100.00 $ 1,102.28 $ 1,100.00 $ 3,300.00 <br />63 SIGNAL CABLE, CONTROL, COPPER, 3C/14 <br />GAUGE 4120 LFT $ 4.02 $ 16,562.40 $ 4.00 $ 16,480.00 $ 4.02 $ 4.00 $ 4.01 $ 4.00 $ 16,480.00 <br />64 SIGNAL CABLE, CONTROL, COPPER, 5C/14 <br />GAUGE 4674 LFT $ 4.72 $ 22,061.28 $ 4.70 $ 21,967.80 $ 4.72 $ 4.70 $ 4.71 $ 5.00 $ 23,370.00 <br />65 SIGNAL CABLE, CONTROL, COPPER, 7C/14 <br />GAUGE 287 LFT $ 5.02 $ 1,440.74 $ 5.00 $ 1,435.00 $ 5.02 $ 5.00 $ 5.01 $ 5.00 $ 1,435.00 <br />66 SIGNAL CABLE, CONTROL, COPPER, 9C/14 <br />GAUGE 549 LFT $ 5.52 $ 3,030.48 $ 5.50 $ 3,019.50 $ 5.52 $ 5.50 $ 5.51 $ 6.00 $ 3,294.00 <br />67 UNDERDRAIN, 6" 950 LFT $ 40.63 $ 38,598.50 $ 28.00 $ 26,600.00 $ 40.63 $ 28.00 $ 34.32 $ 30.00 $ 28,500.00 <br />68 SPAN, CATENARY, AND TETHER 4 EACH $ 8,033.09 $ 32,132.36 $ 8,000.00 $ 32,000.00 $ 8,033.09 $ 8,000.00 $ 8,016.55 $ 4,500.00 $ 18,000.00 <br />69 DISCONNECT HANGER 4 EACH $ 502.07 $ 2,008.28 $ 500.00 $ 2,000.00 $ 502.07 $ 500.00 $ 501.04 $ 500.00 $ 2,000.00 <br />70 SIGNAL CABLE, SERVICE, COPPER, 3C/8 GAUGE 25 LFT $ 8.03 $ 200.75 $ 8.00 $ 200.00 $ 8.03 $ 8.00 $ 8.02 $ 8.00 $ 200.00 <br />71 PEDESTRIAN SIGNAL HEAD, COUNTDOWN, 18 <br />IN.32 EACH $ 903.72 $ 28,919.04 $ 900.00 $ 28,800.00 $ 903.72 $ 900.00 $ 901.86 $ 750.00 $ 24,000.00 <br />72 SIGNAL POLE FOUNDATION, 24 IN. X 24 IN. X 36 <br />IN.20 EACH $ 903.72 $ 18,074.40 $ 900.00 $ 18,000.00 $ 903.72 $ 900.00 $ 901.86 $ 900.00 $ 18,000.00 <br />73 PEDESTRIAN PUSH BUTTON, APS 32 EACH $ 1,255.17 $ 40,165.44 $ 1,250.00 $ 40,000.00 $ 1,255.17 $ 1,250.00 $ 1,252.59 $ 1,250.00 $ 40,000.00 <br />74 SIGNAL POLE, PEDESTAL, 11 FT 20 EACH $ 1,506.20 $ 30,124.00 $ 1,500.00 $ 30,000.00 $ 1,506.20 $ 1,500.00 $ 1,503.10 $ 1,500.00 $ 30,000.00 <br />75 LUMINAIRE, MAST ARM, 20 FT 1 EACH $ 3,012.41 $ 3,012.41 $ 3,000.00 $ 3,000.00 $ 3,012.41 $ 3,000.00 $ 3,006.21 $ 3,000.00 $ 3,000.00 <br />76 GRIDSMART VEHICLE DETECTION SYSTEM 4 EACH $ 35,144.74 $ 140,578.96 $ 35,000.00 $ 140,000.00 $ 35,144.74 $ 35,000.00 $ 35,072.37 $ 22,000.00 $ 88,000.00 <br />77 BRICK PAVERS 62 SYS $ 291.45 $ 18,069.90 $ 636.00 $ 39,432.00 $ 636.00 $ 291.45 $ 463.73 $ 292.00 $ 18,104.00 <br />78 PLANT, DECIDUOUS TREE, SINGLE STEM, OVER <br />2 IN. TO 2.5 IN.109 EACH $ 552.27 $ 60,197.43 $ 550.00 $ 59,950.00 $ 552.27 $ 550.00 $ 551.14 $ 550.00 $ 59,950.00 <br />79 PLANT, DECIDUOUS SHRUB, 18 IN. TO 24 IN. 362 EACH $ 80.33 $ 29,079.46 $ 80.00 $ 28,960.00 $ 80.33 $ 80.00 $ 80.17 $ 80.00 $ 28,960.00 <br />80 PLANT, EVERGREEN SHRUB, 15 IN. TO 18 IN. 307 EACH $ 70.29 $ 21,579.03 $ 70.00 $ 21,490.00 $ 70.29 $ 70.00 $ 70.15 $ 50.00 $ 15,350.00 <br />81 PLANT, ORNAMENTAL GRASS, NO.2 1292 EACH $ 24.10 $ 31,137.20 $ 24.00 $ 31,008.00 $ 24.10 $ 24.00 $ 24.05 $ 18.00 $ 23,256.00 <br />82 PLANT, EVERGREEN SHRUB, NO.3 294 EACH $ 65.27 $ 19,189.38 $ 65.00 $ 19,110.00 $ 65.27 $ 65.00 $ 65.14 $ 58.00 $ 17,052.00 <br />X:\Projects\2022\2261\292850 South Bend Angela\04_ProjDeliverables\Bids\Angela Bid Tabulation 6-13-2023 Page 4 of 5