Laserfiche WebLink
UNIT PRICE EXTENSION UNIT PRICE EXTENSION High Low Average UNIT PRICE EXTENSION <br />CITY OF SOUTH BEND, INDIANA <br />CITY OF SOUTH BEND BOARD OF PUBLIC WORKS <br />ANGELA BOULEVARD IMPROVEMENTS <br />PROJECT NO. 122-059 <br />BIDS OPENING: 6/13/2023 <br /> CONTRACTOR UNIT PRICES ENGINEER'S ESTIMATEITEM <br />NO.DESCRIPTION QUANTITY UNIT <br />RIETH RILEY CONSTRUCTION <br />COMPANY, INC. <br />MILESTONE CONTRACTORS <br />NORTH, INC. <br />1 CONSTRUCTION ENGINEERING 1 LS $ 15,000.00 $ 15,000.00 $ 9,780.00 $ 9,780.00 $ 15,000.00 $ 9,780.00 $ 12,390.00 $ 45,000.00 $ 45,000.00 <br />2 MOBILIZATION AND DEMOBILIZATION 1 LS $ 108,829.14 $ 108,829.14 $ 190,400.00 $ 190,400.00 $ 190,400.00 $ 108,829.14 $ 149,614.57 $ 180,000.00 $ 180,000.00 <br />3 CLEARING RIGHT OF WAY 1 LS $ 30,000.00 $ 30,000.00 $ 28,600.00 $ 28,600.00 $ 30,000.00 $ 28,600.00 $ 29,300.00 $ 65,000.00 $ 65,000.00 <br />4 CLEAN STORM STRUCTURES 69 EACH $ 702.89 $ 48,499.41 $ 620.00 $ 42,780.00 $ 702.89 $ 620.00 $ 661.45 $ 500.00 $ 34,500.00 <br />5 SIDEWALK CONCRETE, REMOVE 600 SYS $ 86.10 $ 51,660.00 $ 32.00 $ 19,200.00 $ 86.10 $ 32.00 $ 59.05 $ 25.00 $ 15,000.00 <br />6 EXCAVATION, COMMON 2199 CYS $ 118.87 $ 261,395.13 $ 57.00 $ 125,343.00 $ 118.87 $ 57.00 $ 87.94 $ 38.00 $ 83,562.00 <br />7 BORROW 198 CYS $ 197.07 $ 39,019.86 $ 90.00 $ 17,820.00 $ 197.07 $ 90.00 $ 143.54 $ 25.00 $ 4,950.00 <br />8 TEMPORARY INLET PROTECTION 73 EACH $ 247.56 $ 18,071.88 $ 185.00 $ 13,505.00 $ 247.56 $ 185.00 $ 216.28 $ 250.00 $ 18,250.00 <br />9 MILLING, ASPHALT, 1 1/2 IN. 21800 SYS $ 2.61 $ 56,898.00 $ 2.70 $ 58,860.00 $ 2.70 $ 2.61 $ 2.66 $ 13.00 $ 283,400.00 <br />10 COMPACTED AGGREGATE NO. 53 315 TON $ 129.36 $ 40,748.40 $ 40.00 $ 12,600.00 $ 129.36 $ 40.00 $ 84.68 $ 40.00 $ 12,600.00 <br />11 HMA PATCHING FULL DEPTH, TYPE B 42 TON $ 1,447.86 $ 60,810.12 $ 330.00 $ 13,860.00 $ 1,447.86 $ 330.00 $ 888.93 $ 150.00 $ 6,300.00 <br />12 HMA, SURFACE, TYPE B 1821 TON $ 151.48 $ 275,845.08 $ 157.00 $ 285,897.00 $ 157.00 $ 151.48 $ 154.24 $ 100.00 $ 182,100.00 <br />13 HMA, INTERMEDIATE, TYPE B 35 TON $ 394.44 $ 13,805.40 $ 160.00 $ 5,600.00 $ 394.44 $ 160.00 $ 277.22 $ 100.00 $ 3,500.00 <br />14 HMA, BASE, TYPE B 97 TON $ 230.21 $ 22,330.37 $ 140.00 $ 13,580.00 $ 230.21 $ 140.00 $ 185.11 $ 95.00 $ 9,215.00 <br />15 HMA, INTERMEDIATE OG, TYPE B 38 TON $ 371.22 $ 14,106.36 $ 180.00 $ 6,840.00 $ 371.22 $ 180.00 $ 275.61 $ 100.00 $ 3,800.00 <br />16 SIDEWALK, CONCRETE, 4 IN. 104 SYS $ 84.48 $ 8,785.92 $ 105.00 $ 10,920.00 $ 105.00 $ 84.48 $ 94.74 $ 60.00 $ 6,240.00 <br />17 SIDEWALK, CONCRETE, 6 IN. 597 SYS $ 89.20 $ 53,252.40 $ 108.00 $ 64,476.00 $ 108.00 $ 89.20 $ 98.60 $ 70.00 $ 41,790.00 <br />18 CURB RAMP, CONCRETE 393 SYS $ 336.52 $ 132,252.36 $ 198.00 $ 77,814.00 $ 336.52 $ 198.00 $ 267.26 $ 210.00 $ 82,530.00 <br />19 DETECTABLE WARNING SURFACES 55 SYS $ 191.57 $ 10,536.35 $ 200.00 $ 11,000.00 $ 200.00 $ 191.57 $ 195.79 $ 210.00 $ 11,550.00 <br />20 CURB, REMOVE 2074 LFT $ 20.38 $ 42,268.12 $ 18.00 $ 37,332.00 $ 20.38 $ 18.00 $ 19.19 $ 7.00 $ 14,518.00 <br />21 CURB, CONCRETE 446 LFT $ 72.30 $ 32,245.80 $ 80.00 $ 35,680.00 $ 80.00 $ 72.30 $ 76.15 $ 45.00 $ 20,070.00 <br />22 CURB AND GUTTER, CONCRETE 1628 LFT $ 75.90 $ 123,565.20 $ 96.00 $ 156,288.00 $ 96.00 $ 75.90 $ 85.95 $ 75.00 $ 122,100.00 <br />23 SODDING, NURSERY 1939 SYS $ 44.46 $ 86,207.94 $ 28.00 $ 54,292.00 $ 44.46 $ 28.00 $ 36.23 $ 7.50 $ 14,542.50 <br />24 CASTING, ADJUST TO GRADE 23 EACH $ 896.69 $ 20,623.87 $ 900.00 $ 20,700.00 $ 900.00 $ 896.69 $ 898.35 $ 600.00 $ 13,800.00 <br />25 PCCP FOR APPROACHES, 6 IN. 30 SYS $ 118.12 $ 3,543.60 $ 165.00 $ 4,950.00 $ 165.00 $ 118.12 $ 141.56 $ 119.00 $ 3,570.00 <br />26 PIPE, TYPE 2, CIRCULAR, 12 IN. 91 LFT $ 175.67 $ 15,985.97 $ 255.00 $ 23,205.00 $ 255.00 $ 175.67 $ 215.34 $ 176.00 $ 16,016.00 <br />27 INLET, B15 5 EACH $ 7,923.37 $ 39,616.85 $ 6,400.00 $ 32,000.00 $ 7,923.37 $ 6,400.00 $ 7,161.69 $ 3,500.00 $ 17,500.00 <br />28 INLET, C15 8 EACH $ 9,477.58 $ 75,820.64 $ 7,800.00 $ 62,400.00 $ 9,477.58 $ 7,800.00 $ 8,638.79 $ 3,500.00 $ 28,000.00 <br />29 CASTING, 4, FURNISH AND ADJUST TO GRADE 12 EACH $ 1,335.75 $ 16,029.00 $ 1,300.00 $ 15,600.00 $ 1,335.75 $ 1,300.00 $ 1,317.88 $ 750.00 $ 9,000.00 <br />30 MAINTAINING TRAFFIC 1 LS $ 30,493.80 $ 30,493.80 $ 43,370.01 $ 43,370.01 $ 43,370.01 $ 30,493.80 $ 36,931.91 $ 75,000.00 $ 75,000.00 <br />31 ADJUST VAULT LID TO GRADE 1 EACH $ 14,918.11 $ 14,918.11 $ 34,990.00 $ 34,990.00 $ 34,990.00 $ 14,918.11 $ 24,954.06 $ 1,500.00 $ 1,500.00 <br />32 SIGN GROUND MOUNTED RESET 20 EACH $ 100.41 $ 2,008.20 $ 100.00 $ 2,000.00 $ 100.41 $ 100.00 $ 100.21 $ 200.00 $ 4,000.00 <br />33 DELINEATOR 6 EACH $ 100.41 $ 602.46 $ 320.00 $ 1,920.00 $ 320.00 $ 100.41 $ 210.21 $ 750.00 $ 4,500.00 <br />34 TRANSVERSE MARKING, THERMOPLASTIC, <br />CROSSWALK LINE, WHITE, 24 IN.1720 LFT $ 13.20 $ 22,704.00 $ 13.15 $ 22,618.00 $ 13.20 $ 13.15 $ 13.18 $ 14.00 $ 24,080.00 <br />35 TRANSVERSE MARKING, THERMOPLASTIC, <br />STOP LINE, WHITE, 24 IN.261 LFT $ 13.20 $ 3,445.20 $ 13.15 $ 3,432.15 $ 13.20 $ 13.15 $ 13.18 $ 14.00 $ 3,654.00 <br />36 TRANSVERSE MARKING, THERMOPLASTIC, <br />CROSSHATCH LINE, WHITE, 12 IN.1130 LFT $ 6.25 $ 7,062.50 $ 6.22 $ 7,028.60 $ 6.25 $ 6.22 $ 6.24 $ 15.00 $ 16,950.00 <br />37 LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN. 342 LFT $ 0.74 $ 253.08 $ 0.74 $ 253.08 $ 0.74 $ 0.74 $ 0.74 $ 15.00 $ 5,130.00 <br />38 TRANSVERSE MARKING, THERMOPLASTIC, <br />PARKING LINE, WHITE 4 IN.996 LFT $ 2.06 $ 2,051.76 $ 2.05 $ 2,041.80 $ 2.06 $ 2.05 $ 2.06 $ 3.00 $ 2,988.00 <br />39 TRANSVERSE MARKING, THERMOPLASTIC, <br />PARKING LINE, BLUE 4 IN.229 LFT $ 4.37 $ 1,000.73 $ 4.35 $ 996.15 $ 4.37 $ 4.35 $ 4.36 $ 5.00 $ 1,145.00 <br />40 LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. 1347 LFT $ 0.74 $ 996.78 $ 0.74 $ 996.78 $ 0.74 $ 0.74 $ 0.74 $ 2.00 $ 2,694.00 <br />41 LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN. 63 LFT $ 0.84 $ 52.92 $ 0.84 $ 52.92 $ 0.84 $ 0.84 $ 0.84 $ 3.00 $ 189.00 <br />X:\Projects\2022\2261\292850 South Bend Angela\04_ProjDeliverables\Bids\Angela Bid Tabulation 6-13-2023 Page 3 of 5