B. KOKOSING'S GUARANTEED MAXIMUM PRICE <br />Kokosing will offer a Guaranteed Maximum Price (GMP) with the added guarantee of no provider - <br />initiated change orders. Kokosing will have our key staff available begin working with The City of <br />South Bend immediately after we are selected. During this preconstruction phase, our professional <br />estimators and other project staff are prepared to work closely and collaborate with the City's team <br />to develop and finalize design documents, perform value engineering and review constructability <br />issues. We will support finalizing the design work by leading the coordination with key vendors and <br />provide input on the comparative costs between multiple options. All of the work we do during this <br />phase is included in our provider fee. Whether it takes four weeks or four months, you will not see an <br />invoice from Kokosing. <br />When the plans and concepts are comfortably set from an engineering standpoint, our estimators <br />will establish our GMP At this point, the project team has the information needed to verify the scope <br />against the available budget, conduct any additional rounds of value engineering, and make any <br />additional adjustments to scope. Once we are comfortable with the scope, schedule, and budget, <br />the guaranteed maximum price is finalized. Once the GMP is agreed to, we will move forward with <br />the contract and, after the execution, we will prepare the filing with the state required sixty days after <br />execution. <br />Kokosing's approach to develop and offer a GMP is as follows: <br />1. Utilize the best pricing approach outlined in the previous section. Leveraging our size and buying <br />power delivers industry competitive prices to your corner of Indiana. <br />2. After submitting our GMP, Kokosing will guarantee no provider -led change orders will occur. <br />Our philosophy and culture are to partner with our customers and this is one of the ways we <br />demonstrate our commitment to you. <br />3. Open dialog on risks, their costs, and consequences will inform you to determine how much <br />risk (activities and dollars) are to be included in the GMP The section below describes how we <br />approach the inclusion of risks in our GSC contracts. <br />4. Kokosing is prepared to negotiate and execute the contract as quickly as the design work can be <br />performed. Our resources are at your service. We will meet your timetable to define the scope, <br />finalize the open book pricing, and prepare to execute the GSC contract between American <br />Structurepoint and Kokosing together with any exhibits and attachments. <br />5. One hundred percent (100%) of the project's direct cost savings will go back to The City of South <br />Bend using the open -book pricing method. <br />6. Work not included in the original GSC, such as additional upgrades, can be included in the <br />project at a later time. Any new work that is paid for from project savings will be at cost with no <br />additional overhead and profit added. <br />Once the contract is executed, the project proceeds like any other capital construction project. Changes <br />to the work are estimated, provided to The City of South Bend for evaluation and, if authorized, added <br />to the project. Most clients add work to contracts and most clients pay for it out of realized project <br />savings. During the preconstruction phase, it is likely that the "wish list" activities will be identified, <br />costed and then put on a shelf, to be brought out when savings are realized. Most of our GSC projects <br />end with a change order that returns unused funds and savings to the Owner. The owner has not paid <br />more than the negotiated GMP on any of our GSC contracts. Table 6-1 summarizes the final change <br />orders issues for our completed GSC projects denoting how savings was used. <br />SOUTH BEND, INDIANA GSC 46 <br />