Laserfiche WebLink
22 <br />CITY OF EUCLID <br />Water Pollution Control Center Facility Improvements <br />Euclid, Ohio <br />EUCLID, OH <br />Kokosing was the selected CMAR for this major process conversion project for the Euclid WWTP to address CSO peak flows. As the CMAR, Kokosing worked with the City’s Design Engineer to optimize pricing and work sequencing to ensure maintenance of operations during construction. <br />The overall project consisted of phased construction to convert the <br />City’s wastewater treatment plant (WWTP) facilities to a membrane <br />bioreactor (MBR) plant to address CSO peak flows. In addition to <br />the CMAR role, Kokosing was the selected Trade Contractor for <br />multiple phases with subsequent awards for subcontractors. <br />Phase 1: Edgecliff Relief Sewer. The new Edgecliff Relief Sewer <br />provide an emergency bypass for peak flows beyond a one year <br />storm event of 213 MGD. This phase was subcontracted for $3.2 <br />million. <br />Phase 2: Headworks Site Preparation. This phase included mass <br />excavation of dirt and shale, installation of H-pile and lagging <br />wall, 96-inch RCP storm sewer relocation and construction of a <br />new cast-in-place concrete influent chamber. This phase was self <br />performed for $6.6 million. <br />Phase 3: Headworks Facility & Wet Weather Equalization Basin. <br />The new headworks complex provide coarse screening for flows <br />up to 213 MGD, fine screening, grit and grease removal and flow <br />metering for flows up to 66 MGD discharging to the future MBR <br />WWTP. Kokosing self performed this phase for $47.7 million. <br />Phase 4A: MBR Procurement. Kokosing evaluated the constructability <br />and construction cost of up to three MBR alternatives; assisted in <br />negotiating the scope of supply for the selected alternative and <br />purchased the equipment at the negotiated price of $26.4 million <br />for incorporation into Phase 4B. <br />Phase 4B: WWTP Upgrade to MBR. Installation of a new MBR <br />process within existing WWTP tankage to treat peak flows up to <br />66 MGD. This phase was self performed for $52.3 million. <br />PROCUREMENT METHOD <br />CM at Risk <br />CONTRACTING METHOD <br />Cost Plus Fixed Fee <br />TOTAL CONTRACT VALUE <br />$156,000,000 <br />SELF-PERFORM TRADE <br />• Sitework <br />• Earthmoving <br />• Buried Utilities <br />• Concrete <br />• Process Equipment Install <br />SUBCONTRACT TRADES <br />• Buried Utilities <br />• Hauling <br />• Electrical <br />• I&C <br />• HVAC & Plumbing <br />• Architectural Finishes <br />OWNER'S CONTACT <br />Dan Knecht | Public Service <br />Director <br />216.289.2701 <br />dknecht@cityofeuclid.com