My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:59 PM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
20SOUTH BEND, INDIANA GSC <br />SECTION 3 <br />APPLICABLE PAST PROJECTS AND REFERENCES <br />Kokosing truly is an industry-leading water and wastewater General Contractor. The depth of our GSC <br />experience means we know how to deliver this project within the delivery method and to meet your <br />expectations. We offer full page descriptions of three of our CSO projects and one WWTP project <br />with emphasis on clarifier rebuilds to show our capability for your work. Finally, we have provided a <br />list of our recent wastewater projects, further demonstrating our experience and capacity to deliver. <br />A. LIST OF COMPLETED GSC PROJECTS AND REFERENCE PROJECTS <br />This section contains reference information on all of our completed GSC projects with references. Highlighted projects contain scope components that are similar in nature to the work planned at the South Bend Wastewater Treatment Plant. <br /> h Albion, IN Treatment Lagoon Improvements | Jacob Ihrie | 260.636.2246 <br /> h Anderson, IN Phosphorus Improvements | Nara Manor | 765.648.6565 <br /> h Angola, IN Hires Lift Station Improvements | Jeff Gaff | 260.665.6806 <br /> h Bluffton, IN Wastewater Treatment Plant Improvements | John Oman | 260.824.6045 <br /> h Decatur, IN WWTP Clarifier Improvements | Karey Fuelling | 260.724.4218 <br /> h Decatur, IN Waterworks Improvement Project, Phase 1 New East WTP | Bill Carpenter | <br />260.724.7171 <br /> h Decatur, IN Waterworks Improvement Project, Phase 2 Winchester WTP Replacement | Bill Carpenter | 260.724.7171 <br /> h East Chicago Sanitary District, East Chicago, IN LTCP Phase 2 | Ken Myers | 219.391.8466 <br /> h Evansville Water and Sewer Utility, West WWTP Storage Basin and Headworks | Matt Montgomery | 812.470.4265 <br /> h Fort Wayne, IN Three Rivers Filtration Plan UV Disinfection | Andrew Schipper | 260.427.2681 <br /> h Fort Wayne, IN WPCP Primary / Secondary Treatment and Digester Improvements | Zach Schortgen | 260.427.2681 <br /> h Gary Sanitary District, Gary, IN Filter Building Rehabilitation Project | Spike Peller | <br />219.944.0595 <br /> h Lebanon Utilities, Lebanon, IN Water Treatment System Improvements Program Phases 1, 2, and 3 | Ryan Ottinger | 765.482.8751 <br /> h Lebanon Utilities, Lebanon, IN Syracuse Drive Water Line Replacement | Ryan Ottinger | <br />765.482.8751 <br /> h Plainfield, IN West Fork Interceptor and Lift Station Phase 1 | Jason Castetter | 317.839.3490 <br /> h Plainfield, IN West Fork Interceptor and Lift Station Phase 2 | Jason Castetter | 317.839.3490 <br /> h Plainfield, IN Westmere Sanitary Sewer and Lift Station Decommisioning | Jason Castetter | 317.839.3490 <br /> h Plymouth, IN Wastewater Treatment Plant Expansion | Donnie Davidson | 260.624.2699 <br /> h Plymouth, IN Wastewater Treatment Plant Cap and Main | Donnie Davidson | 260.624.2699 <br /> h Syracuse, IN Oxidation Ditch Improvements | Virginia Cazier | 574.457.3216
The URL can be used to link to this page
Your browser does not support the video tag.