Laserfiche WebLink
MATT MCCARTHY <br />Safety Director <br />EXPERIENCE <br />Toledo Waterways Initiative, Downtown Storage Basin, Toledo, Ohio <br />Construction of a 17-million gallon storage basin and dewatering <br />pump station. Other scope items include seven buried regulators <br />constructed around existing combined sewers, 72" and 48" diameter <br />sewer installation, 720 LF of 110" pipe installed in a hand -mined <br />tunnel, road restoration and site work. Project included 225,000 CY of <br />excavation and 45,000 CY of concrete. Contract Amount: $43,900,000 <br />Toledo Waterways Initiative, Ottawa River Storage Facility, Toledo, <br />Ohio <br />Construction of a 175 MGD pump station and 36.3 million gallon <br />storage basin. Other scope items included 9,000 LF of large diameter <br />deep sewer installation, six interceptor structures, five of which were <br />constructed under and around existing sewers, road rehabilitation <br />and site work. Project included 450,000 CY of excavation and 50,000 <br />CY of concrete. Contract Amount: $69,000,000 <br />Private Client, Combined Cycle Power Facility, Ohio <br />Construction of a new 90OMW 2x1 combined cycle power plant on a <br />greenfield site. Full construction responsibility with over 2.7 million <br />manhours expended. Project substantially completed in 28 months. <br />Kokosing self -performed over 90% of the work and direct hired all <br />crafts with a peak workforce of over 1,200. <br />Power Private Client, Coke and Cogeneration Facility, Southwest <br />Ohio <br />New 100-oven metallurgical coke and 67MW cogeneration power <br />facility on a greenfield site that supplies AK Steel with blast furnace <br />coke and electrical power. Project substantially completed in 18 <br />months. Kokosing self -performed over 1.9 million manhours of the <br />2.2 million total person -hours At peak workforce of nearly 900, the <br />talents of nearly 2,300 contributing workers were utilitized. <br />SOUTHBEND, INDIANA GSC 10 <br />