Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:09:44 AM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MATT MCCARTHY <br />Safety Director <br />EXPERIENCE <br />Toledo Waterways Initiative, Downtown Storage Basin, Toledo, Ohio <br />Construction of a 17-million gallon storage basin and dewatering <br />pump station. Other scope items include seven buried regulators <br />constructed around existing combined sewers, 72" and 48" diameter <br />sewer installation, 720 LF of 110" pipe installed in a hand -mined <br />tunnel, road restoration and site work. Project included 225,000 CY of <br />excavation and 45,000 CY of concrete. Contract Amount: $43,900,000 <br />Toledo Waterways Initiative, Ottawa River Storage Facility, Toledo, <br />Ohio <br />Construction of a 175 MGD pump station and 36.3 million gallon <br />storage basin. Other scope items included 9,000 LF of large diameter <br />deep sewer installation, six interceptor structures, five of which were <br />constructed under and around existing sewers, road rehabilitation <br />and site work. Project included 450,000 CY of excavation and 50,000 <br />CY of concrete. Contract Amount: $69,000,000 <br />Private Client, Combined Cycle Power Facility, Ohio <br />Construction of a new 90OMW 2x1 combined cycle power plant on a <br />greenfield site. Full construction responsibility with over 2.7 million <br />manhours expended. Project substantially completed in 28 months. <br />Kokosing self -performed over 90% of the work and direct hired all <br />crafts with a peak workforce of over 1,200. <br />Power Private Client, Coke and Cogeneration Facility, Southwest <br />Ohio <br />New 100-oven metallurgical coke and 67MW cogeneration power <br />facility on a greenfield site that supplies AK Steel with blast furnace <br />coke and electrical power. Project substantially completed in 18 <br />months. Kokosing self -performed over 1.9 million manhours of the <br />2.2 million total person -hours At peak workforce of nearly 900, the <br />talents of nearly 2,300 contributing workers were utilitized. <br />SOUTHBEND, INDIANA GSC 10 <br />