My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
eowEn► FINANCIAL APPROACH <br />► Include Outside Expertise: We will use our relationships with process equipment manufacturers, <br />and local subcontractors to validate budgets and changes throughout the design phase. <br />► Complete Guaranteed Maximum Price (GMP) at 60% Design: Our collaboration and past pricing <br />iterations for your future projects through 60% gives us the confidence we need to offer the <br />GMP. We will include a "Risk Register" to assign appropriate responsibility and contingency for <br />each point of risk. The contingency will be presented as a stand alone number for transparency <br />purposes. <br />5c) Explain your firm's approach to open book pricing allowing the City to view the <br />Pricing structure (mark up covering overhead and profit) of the Qualified Provider <br />and subcontractors. Explain your firm's approach to open book pricing allowing the <br />City to view the contingency for the project. Explain your firm's approach to open <br />book pricing allowing the City to view savings from value engineering or other <br />project cost reductions. <br />Bowen supplies an open book pricing sheet similar to the one found at the end of this section on a <br />monthly basis or as requested by South Bend. This allows South Bend and Engineering Partners to <br />track our cost for subcontractors, vendors, material suppliers, and labor versus the original budget. We <br />also include a contingency use log to show where and how these dollars are spent or saved. <br />Our commitment to South Bend is that 100% of savings derived from the pricing sheet and <br />contingency will be for the use of South Bend. Furthermore, these savings can be used as directed <br />by South Bend on additional "wish list" items that are related to the WWTP/CSO 045 EQ Basin and <br />Clarifier Upgrade Projects for NO additional fee. This is our idea of true transparency that incentivizes <br />our team to maximize savings. <br />5d) Provide proof that the Provider can furnish a Performance Bond and a Payment <br />Bond in the amount of 100 percent of the project. <br />Bowen has been bonding projects in Indiana without an issue for the past 50+ years. Please see a <br />letter from our bonding agency (Dimond Bros.) at the end of this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.