My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOWEN <br />■ STRUCTUREPOINT <br />BOWEN + $■ STRUCTUREPOINT PROJECT AND PARTNERING EXPERIENCE <br />PROJECT NAME <br />TOTAL CONTRACTS <br />LOCATION <br />PROJECT DELIVERY <br />Ford Thunderbird Site Demolition for Lauth <br />$6,000,000 <br />Indianapolis, IN <br />Traditional <br />16 Tech Development (3 Phases) <br />$17,000,000 <br />Indianapolis, IN <br />Design -Build <br />Citizens Energy Group Shelby County Lift Station & Force Main <br />$7,400,000 <br />Pleasant View, IN <br />Design -Build <br />IU Health Ring Road Extension <br />$13,000,000 <br />Indianapolis, IN <br />Design -Build <br />Citizens Energy Group Lift Station 101 <br />$2,800,000 <br />Indianapolis, IN <br />Traditional <br />IU Health Enabling Infrastructure <br />$25,000,000 <br />Indianapolis, IN <br />Design -Build <br />City of South Bend Water Treatment Plant Filter Project <br />$1,800,000 <br />South Bend, IN <br />Guaranteed Savings Contract <br />Citizens Energy Group Cooper Road 2 Million Gallon Tank <br />$2,000,000 <br />Indianapolis, IN <br />Design -Build <br />Aqua Indiana Avon Wastewater Plant Expansion <br />$11,400,000 <br />Avon, IN <br />Design -Build <br />City of Lafayette Loeb Stadium <br />$4,200,000 <br />Lafayette, IN <br />Guaranteed Savings Contract <br />ConAgra Foods Lift Station (with Poindexter Excavating) <br />$150,000 <br />Indianapolis, IN <br />Traditional <br />Evansville Water and Sewer Utility Dewatering (with ESG) <br />$1,200,000 <br />Evansville, IN <br />Design -Build <br />Citizens Energy Group White River Alum Storage Building <br />$2,000,000 <br />Indianapolis, IN <br />Traditional <br />15 <br />13$94M <br />SHARED MARKET EXPERIENCE <br />• Municipal Water <br />Years of Total <br />• Municipal Wastewater <br />Projects <br />Partnership --ontracts <br />• Stormwater Management <br />IIrs'—=1 "-!. I <br />Both Bowen and American Structurepoint <br />Complete Work Across the United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.