Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOW. 'IV <br />Activity ID Activity Name <br />Original Start Finish Notebook <br />Duration <br />2024 <br />• <br />Board of Public Works Selection Ratified <br />J� <br />0 <br />08-Aug-23" <br />♦ Board of Public Works Selection Ratified <br />0 Guaranteed Maximun ice (Finalize Scope, Financing, Schedule, and V.E.) <br />! ♦ Board: of Public Works Approve Contractwith %lcted Provider <br />-------`--------------`-------------`--------------'--------------''----------------------------'------------------------------------------------------------------- <br />Mobilize <br />♦Substantial Completi <br />Pu <br />Fir <br />j = Clarifier Equipment <br />Elect icat Materials <br />Install Deep Well Dewatering System <br />♦ Mobilize: <br />lslafe Clarifiers 1-3--------- ------------- ---- <br />o <br />p ',Final Sitework <br />E—i Seeding <br />Drain &Clean - C1 <br />--------------'----------------------------- <br />Demo - C1 <br />Em Install Well Point Dewatering System; C1 <br />I� $awcutforUnderslabPiping-C1 <br />iiiiiiiiiiin InstallPlleS-C1 <br />Excavate for 36'Influent & 14, RAS Pipe -C1 <br />Mi InstallUnderUab Piping - C1 <br />;Install New Clarifier Equipment- C1 <br />0 Electrical-C1 <br />Paint New Clarifier Equipri C1 <br />Install Weirs, Baifles f)CBS- C1 <br />! InstallGroutFill-Q1 <br />i Startup&Test.C1 <br />Drain & Clean - C2 <br />Dena - C2 <br />-----------------------------I--------------I----------------------- ---I- -------- Install Well PointDewa-- S tem-iC2----------- ;---------------------------------------- <br />g Ys <br />Spwcut for Underslab Piping- C2 <br />mop Install Pii - C2 <br />Excavate for 36'! Influent & 14'! RAS Pipe - W <br />Install Underfila b Piping - C2 j <br />Install New Clarifier Equipment - C2 <br />Electrical - C2 <br />Paint New Clarifier Equipment - C2 <br />O Install Weirs, Baffler, DCBs- C2 <br />! ! ! ! ! ! O In ill - C2, <br />-----Grout F <br />! ! ! ! Startup&Test-G2 <br />10 Drain & Cleean - C3 <br />Demo - C3 <br />�; Install Well F�oint Dewatering System -C3 <br />-----------------------------------------;-------------------------------------- ;------------ -'---------- ----- '--------------;-------------- <br />SawcutforUnderslabPiping -C3 <br />Mili Install Piles-C3 <br />Excavate for 36" Influent & 14" RAS Pipe - C$ <br />Install Underslab Piping - C3 <br />Install New C <br />: larifier Equipment- C3 <br />--------- ! ! EI Electrical - C3 <br />Paint NewClarfierEquipment-C <br />onisit Install Weirs, Baffles, DOBs <br />Install Grout Fill - C3' <br />Startup&Test-l3 <br />A1210 <br />Al330 <br />Guaranteed Maximum Price (Finalize Scope, Financing, Schedule, and V.E.) <br />20 <br />08-Aug-23 <br />05-Sep-23 <br />2 weeks added for VE. Discussions <br />A1340 <br />Board of Public Works Approve Contract with Selcted Provider <br />0 <br />12-Sep-23* <br />A1220 <br />Mobilize <br />0 <br />13-Sep-23 <br />A1230 <br />Substantial Completion <br />0 <br />19-Sep-24 <br />A1240 <br />Punchlist <br />30 <br />20-Sep-24 <br />31-Oct 24 <br />Al250 <br />Final Completion <br />0 <br />31-Oct-24 <br />13-Sep-23 29-Apr-24 <br />Procurement <br />A1260 <br />Clarifier Equipment <br />Electrical Materials <br />.029 <br />160 <br />A1390 <br />60 <br />5 <br />0 <br />13-Sep-23 07-Deo-23 <br />• <br />08-Nov-23 14-Nov-23 <br />08-Nov-23 <br />Siteworkr <br />A1290 <br />Install Deep Well Dewatering System <br />Al350 <br />Mobilize <br />A1400 <br />Isolate Clarifiers 1-3 <br />5 <br />5 <br />08-Nav-23 <br />20-Sep-24 <br />14-Nov-23 <br />26-Sep-24 <br />(Includes: Handrail, Concrete Sidewalk, etc.) <br />A1270 <br />Final Sitework <br />Al280 <br />Seeding <br />5 <br />27-Sep-24 <br />03-Oct-24 <br />175 <br />Clarifier No. <br />Al000 <br />1 <br />Drain & Clean - C1 <br />5 <br />o <br />15-Nov-23 <br />21-Nov-23 <br />A1010 <br />Demo - C1 <br />30 <br />22-Nov-23 <br />08-Jan-24 <br />A1410 <br />Install Well Point Dewatering System - C1 <br />10 <br />20-Feb-24 <br />04-Mar-24 <br />A1020 <br />Sawcutfor Underslab Piping -C1 <br />15 <br />05-Mar-24 <br />25-Mar-24 <br />A1480 <br />Install Piles-C1 <br />10 <br />26-Mar-24 <br />08-Apr-24 <br />A1470 <br />Excavate for 36" Influent & 14" RAS Pipe -C1 <br />10 <br />09-Apr-24 <br />22-Apr-24 <br />A1030 <br />Install Underslab Piping - C1 <br />5 <br />23-Apr-24 <br />29-Apr-24 <br />A1040 <br />Install New Clarifier Equipment- C1 <br />20 <br />30-Apr-24 <br />28-May-24 <br />A1440 <br />Electrical-C1 <br />15 <br />30-Apr-24 <br />20-May-24 <br />A1050 <br />Paint New Clarifier Equipment- C1 <br />20 <br />29-May-24 <br />25-Jun-24 <br />Al060 <br />Install Weirs, Baffles DCBs- C1 <br />10 <br />26-Jun-24 <br />10-Juf24 <br />A1300 <br />Install Grout Fill-C1 <br />5 <br />11-Jul-24 <br />17-Jul24 <br />Al360 <br />Startup & Test -C1 <br />5 <br />18-Jul-24 <br />24-Jul24 <br />Clarifier <br />A1070 <br />• 2 <br />Drain &Clean - C2 <br />160 <br />5 <br />0• <br />09Jan-24 <br />15-Jan-24 <br />A1080 <br />Demo - C2 <br />30 <br />16Jan-24 <br />26-Feb-24 <br />A1420 <br />Install Well Point Dewatering System - C2 <br />10 <br />19-Mar-24 <br />01-Apr-24 <br />Al090 <br />Sawcut for Underslab Piping - C2 <br />15 <br />02-Apr-24 <br />22-Apr-24 <br />A1430 <br />Install Piles - C2 <br />10 <br />23-Apr-24 <br />06-May-24 <br />A1490 <br />Excavate for 36" Influent & 14" RAS Pipe - C2 <br />10 <br />07-May-24 <br />20-May-24 <br />A1100 <br />Install Underslab Piping - C2 <br />5 <br />21-May-24 <br />28-May-24 <br />A1110 <br />Install New Clarifier Equipment - C2 <br />20 <br />29-Ma -24 <br />25-Jun-24 <br />Al530 <br />Electrical - C2 <br />15 <br />29-May-24 <br />18-Jun-24 <br />Al120 <br />Paint New Clarifier Equipment- C2 <br />20 <br />21 <br />24-Jul-24 <br />A1130 <br />Install Weirs, Baffles DCBs- C2 <br />10 <br />25Jul-24 <br />07-Au9-24 <br />A1310 <br />Install Grout Fill - C2 <br />5 <br />08-Aug-24 <br />14-Aug-24 <br />A1370 <br />Startup &Test- C2 <br />5 <br />15-Au9-24 <br />21-Aug-24 <br />Al140 <br />Drain & Clean - C3 <br />5 <br />27-Feb-24 <br />04-Mar-24 <br />A1150 <br />Demo - C3 <br />30 <br />05-Mar-24 <br />15-Apr-24 <br />A1500 <br />Install Well Point Dewatering System -C3 <br />10 <br />16-Apr-24 <br />29-Apr-24 <br />A1160 <br />Sawcutfor Underslab PipingC3 <br />15 <br />30- r-24 <br />%W <br />20-Ma -24 <br />Y <br />A1510 <br />Install Piles-C3 <br />10 <br />21-May-24 <br />04-Jun-24 <br />Al520 <br />Excavate for 36" Influent & 14" RAS Pipe - C3 <br />10 <br />05Jun-24 <br />18-Jun-24 <br />A1170 <br />Install Underslab Piping - C3 <br />5 <br />19Jun-24 <br />25-Jun-24 <br />A1180 <br />Install New Clarifier Equipment- C3 <br />20 <br />21 <br />24-Jul-24 <br />A1540 <br />Electrical-C3 <br />15 <br />26Jun-24 <br />17-Jul-24 <br />Al190 <br />Paint New ClarifierEquipment-C3 <br />20 <br />25Jul-24 <br />21-Aug-24 <br />Al200 <br />Install Weirs, Baffles DCBs- C3 <br />10 <br />22-Aug-24 <br />05-Sep-24 <br />A1320 <br />Install Grout Fill - C3 <br />5 <br />06-Sep-24 <br />12-Sep-24 <br />Al380 <br />Startup&Test-C3 <br />5 <br />13-Seo-24 <br />19-Seo-24 <br />Remaining Level of Effort ♦ ♦ Milestone City of South Bend WWTP Final Clarifiers No. 1-3 Improvements Preliminary <br />Actual Work Proposal Schedule aBOWEN <br />O Remaining Work Data Date: 29-Jun-23 Run Date: 29-Jun-23 _ <br />Critical Remaining Work Page 1 of 1 <br />