My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOWEI'V <br />At 870 Board of Public Works Selection Ratified <br />A1880 Guaranteed Maximum Price (Finalize Scope, Financing, Schedt <br />A1000 Board of Public Works Approve Contract with Selected Provider <br />A1010 Mobilize <br />A1570 Startup & Testing <br />A1020 Substanihal Completion <br />A1030 Punchlist <br />A1040 Final Completion <br />At 940 Contractual Substanital Completion <br />At700 Concrete Design <br />A1710 Rebar <br />A1760 Misc Metals <br />At900 MasonryBrickBbdc <br />A1910 HVAC Units & Materials <br />A1920 Precast Roofing Panels <br />At 640 RCP Pipe <br />At650 Ductile Iron Pipe <br />A1660 Concrete Manholes <br />At670 <br />At680 <br />Dutchland Tank <br />Lift Station Pumps <br />A1720 <br />Hydraulic Actuated Gates <br />At 730 <br />Mechanical Bar Screen <br />At740 <br />Valves <br />At750 <br />Flex Connectors <br />At 770 <br />Radial Flushing Equipmer <br />A1780 <br />MCC <br />At790 <br />Equipment Controls <br />A1810 <br />Generator <br />A1820 <br />PLC Panel <br />A1830 <br />Transformer <br />At840 <br />Lighting Panels <br />At850 <br />Power Panels <br />At860 <br />Field Instruments <br />A1050 Mobilize <br />A1060 Install Erosion Control <br />A1070 Install & Move TemporaryWalk Path <br />A1080 Site Clearing/Grubbing <br />A1090 Coordinate Install Temporary& Permanent Power <br />A1100 Install Dewatering System & Coordinate Discharge Points <br />A1110 Relocate 48" interceptor <br />A1120 Relocate 16" Watermain <br />A1130 Demo Partial Flow Structure & SVDhon Pipe <br />A1150 <br />Excavate <br />A1160 <br />Install Supports for 96" CSO Pipe <br />A1170 <br />F/R/P Foundation <br />A1180 <br />F/R/P Walls <br />A1690 <br />Install 12' Manhole Structure #7 <br />A1300 <br />F/R/P Bump Out Portion of Diversion Structure <br />A1200 <br />MechanicalActivities <br />A1190 <br />Backfill <br />A1210 <br />Pull Shoring <br />At220 Install Temporary Shoring <br />A1230 Selective Demo for Exisifinq Overflow Structure <br />Remaining Level of Effort ♦ ♦ Milestone <br />t� Actual Work <br />Remaining Work <br />0 <br />08-Aug-23* <br />♦ Board of Public Works Selection Ratified <br />� Guaranteed Maximum Price (Finalize Scope, Financing, Schedule, & Vp) <br />♦ Board of public \l orks4prove 6ntra� with Splected;Providgr <br />-------•----------------------•-------------------------------------------------------------------- ------------- •------- --------------------------- ------ <br />1 ! Mobilize <br />0 Startup&Testing; <br />♦ Su,bstanitalCompletion <br />0 ''Punchlist <br />♦', Final Cbmpletipn <br />i ♦ <br />0 Concre� Design <br />� Rebar <br />0 Misc Metals <br />-------' - -------'----- • = <br />masonry Brick/$Iock <br />HVAC Units & Matorials <br />0 Precast Roofing panels <br />RGP Pipe; <br />-------•----- - --- --------------------- -------------------------------------------- ------------- ------------- ------ ------ --------------------------- <br />Ductile Iron Pipe <br />1 Concrete Manholes <br />4utchlaod Tank <br />Lift Station Pumps <br />------' H drauli A ------- ------------------------ ------%------- ------------- ------ ------ --------------------- <br />y F ctuated Gates <br />Mechanical BerScreen <br />Valves <br />Flex Connectors <br />Radial FlushingiEquipment <br />MCC. <br />Equipmont Controls <br />Trarisfer Swiloh <br />Generator <br />------- ------- ------- -------'--------' -------'-------------- ' -------------------------' '-------- ------------ ------ ------------- ------ ------------- --------- <br />PLC Panel <br />Transformer <br />Lighting Panels <br />Power Panels <br />Field Instruments <br />------------------ --------------------------------------------- --------------------------------------------------------------------------------------------------------------------- ----- <br />Mobilize <br />❑ Install Erasion Control <br />p Install;&MovoTem*aryW;alkPatb <br />p Site,Cleadnp/Grubbing <br />- --- p �Y anentPPwer ; -----•-------.- .- <br />o coordinate Install Tem or = ; <br />Install Dewatering System & Coordinate Discharge Points <br />0 Relocate 48"interceptor <br />E6 Relocate 15" Watermain <br />-------' --- ---------'----- -- ------------------ ------ <br />-------; y' non ' <br />Demo Partial Flow Structure & S p Pipe <br />! 0 Install TemporaryiShoring System <br />Excavate <br />❑ Install 9upporlsfor96"CSOPipe <br />-------> _ _ _ --------------------------- <br />t� F/R/P Foun datlon <br />F/R/P Walls <br />❑ Install 12' f�lanhole,Struchjre #7 <br />F/R/P Bump Out Portion of D'Nersion Structure <br />O MechaniglActivities <br />•------- T, -------------- ;-------------------------------------------- ----------�- ' --------------------t------------------------ --------------' ---- ----- <br />O BacrII f <br />O Pull Shoring <br />0 Install TempiraryShoring <br />iO Selective; Demo for Existing Overflow Structure <br />20 <br />08-Aug-23 <br />05-Sep-23 <br />2 weeks added for V.E. Discussions <br />0 <br />12-Sep-23* <br />0 <br />01-Nov-23 <br />10 <br />30-Apr-25 <br />13-May-25 <br />0 <br />13-May-25 <br />30 <br />14-May-25 <br />25-Jun-25 <br />0 <br />25-Jun-25 <br />0 <br />17-Deo-25* <br />45 <br />19-Sep-23 <br />20-Nov-23 <br />30 <br />19-Sep-23 <br />30-Oct-23 <br />20-Nov-23 <br />20-Nov-23 <br />45 <br />19-Sep-23 <br />45 <br />19-Sep-23 <br />120 <br />19-Sep-23 <br />08-Mar-24 <br />60 <br />19-Sep 23 <br />13-Dec-23 <br />*1 <br />-• <br />•- <br />60 <br />19-Sep-23 <br />13-Dec-23 <br />13-Dec-23 <br />60 <br />19-Sep-23 <br />60 <br />19-Sep-23 <br />13-Deo-23 <br />:0 <br />150 <br />19-Sep-23 <br />0 <br />19-Apr-24 <br />180 <br />19-Sep-23 <br />03-Jun-24 <br />150 <br />19-Se 23 <br />p <br />19- r-24 <br />Ap <br />90 <br />19-Sep-23 <br />26-Jan-24 <br />120 <br />19-Sep-23 <br />08-Mar-24 <br />90 <br />19-Sep-23 <br />26-Jan-24 <br />150 <br />19-Sep-23 <br />19-Apr-24 <br />0 <br />. <br />• <br />200 <br />19-Sep-23 <br />01-Jul-24 <br />150 <br />19-Sep-23 <br />19-Apr-24 <br />180 <br />19-Sep-23 <br />03-Jun-24 <br />240 <br />19-Sep-23 <br />27-Aug-24 <br />200 <br />19-Sep-23 <br />01-Jul-24 <br />180 <br />19-Sep-23 <br />03-Jun-24 <br />120 <br />19-Sep-23 <br />08-Mar-24 <br />150 <br />19-Sep-23 <br />19-Apr-24 <br />90 <br />19-Sep-23 <br />26-Jan-24 <br />35 <br />• <br />�- <br />5 <br />01-Nov-23* <br />07-Nov-23 <br />5 <br />08-Nov-23 <br />14-Nov-23 <br />10 <br />15-Nov-23 <br />30-Nov-23 <br />5 <br />01-De23 <br />07-De23 <br />10 <br />08-Dec-23 <br />21-Dec-23 <br />53 <br />D- <br />0 <br />20 <br />22-Dec-23 <br />22-Jan-24 <br />20 <br />23-Jan-24 <br />19-Feb 24 <br />10 <br />20-Feb-24 <br />04-Mar-24 <br />3 <br />05-Mar-24 <br />07-Mar-24 <br />11-Apr-24 <br />178 <br />25 <br />0: <br />08-Mar-24 <br />25 <br />12-Apr-24 <br />16-May-24 <br />5 <br />17-May-24 <br />23-May-24 <br />13 <br />24-May-24 <br />12-Jun-24 <br />35 <br />13-Jun-24 <br />01-Aug-24 <br />5 <br />02-Aug-24 <br />08-Aug-24 <br />10 <br />09-Aug-24 <br />I 22-Aug-24 <br />I <br />40 <br />23-Aug-24 <br />18-Oct-24 <br />Includes Pumps, Screen, Gates, & Piping <br />10 <br />21-Oct-24 <br />01-Nov-24 <br />10 <br />04-Nov-24 <br />15-Nov-24 <br />• <br />15 <br />12-Apr-24 <br />02-May-24 <br />I 16-Mav-24 <br />10 <br />03-Mav-24 <br />City of South Bend CSO 045 EQ Basin Preliminary <br />Proposal Schedule <br />Data Date: 29-Jun-23 Run Date: 29-Jun-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.