Laserfiche WebLink
BOWFIN <br />DIVERSION STRUCTURE VALUE ENGINEERING CONSIDERATIONS <br />GRAVEL <br />WM <br />New manhole <br />_ not required #7 <br />New manhole <br />not required #6 <br />� Lk WV70F,214 <br />Benefit of Value Engineering Consideration <br />- Eliminates cost of 96" overflow pipeline <br />- Eliminates precast manhole structure # 6 & 7 <br />- Significant reduction in bypass pumping requirements <br />- Significant reduction in de -watering efforts <br />- Significant reduction in the amount excavating required <br />- Significant reduction in shoring needs <br />- Reduction of work in the 100 year flood plain <br />Benefit of Value Engineering Consideration <br />- Eliminates 96" Effluent pipeline <br />- Eliminates precast manhole structure number 6 <br />- Reduction in bypass pumping needs <br />�_APP. R <br />ST. <br />Keep existing overflow modify <br />/ update equipment, but leave <br />existing structure in place <br />GRAVEL I I <br />,o <br />New normal <br />flow pipeline, <br />Benefit of Value Engineering Consideration <br />- Reduction in bypass pumping efforts J <br />Z---/ / <br />►_ Modify / update <br />as required <br />