Laserfiche WebLink
BOWE7V <br />GENERAL NOTES: \ I\ <br />1. SEE DEMOLITION PLAN ON SHEET C-05 FOR \ \ <br />REMOVAL AND ABANDONMENT INFORMATION. <br />100 YR. \ 100 YR. <br />2. FENCE WILL BE INSTALLED IN SUCH MANNER FLOODPLAIN I \.�FLOODPLAIN <br />AS TO PROTECT TREE, IN SHOWN LOCATION. \ \ <br />I \ <br />A I \ <br />APP. R I \ \ <br />PROJECT VALUE ENGINEERING CONSIDERATIONS <br />vv II <br />Benefits of VE Consideration <br />Reduces excavation foot print <br />- Reduces shoring requirements <br />II <br />- Eliminates 60" pipeline run between s °°_y =\ _ <br />diversion structure and lift station.___ - \ <br />\ II <br />- Reduces de -watering efforts <br />(MATCH EXISTING) <br />u <br />u <br />u <br />u <br />II <br />II <br />II RELOCATED 10'— <br />II II ASPHALT PATH <br />II II <br />II II <br />II II <br />II II <br />II II � <br />II II <br />GE <br />c _ — new manhole no <br />longer regruied PROPOSED <br />BILE GA <br />\\ �� <br />This line does not require \\ <br />�— location any more. \\ <br />a` <br />I <br />>\\ <br />RESTORED 10' <br />ASPHALT PATH <br />II <br />II <br />/ II <br />II <br />I II <br />/ II <br />II <br />II <br />I II <br />II <br />II <br />APP. <br />II <br />II <br />II o <br />PROPOSED 20' W O <br />/ DOUBLE GATE <br />05 <br />IIikE <br />SEE NOTE 2 VA VA <br />I I VA <br />I�r <br />I vv <br />1 I vA <br />PROPOSED \\ <br />f 1 I EO BASIN p AA <br />PROPOSED <br />I. TRANSFORMER <br />10' SETBACK <br />_ PROPOSED \\ <br />T}� CONTROL BUILDING <br />II GRAVELvA <br />/ <br />\\ <br />PROPOSED INFLUENT <br />\\ <br />LIFT STATION <br />j � <br />\ ,BOLLARDS <br />(TYP.) <br />\ i <br />0 b � <br />i <br />i <br />100 YR. 1 <br />PROPOSED 6' <br />BARBED WIRE FENCE <br />FLOODPLAIN� / <br />�100 <br />/(MATCH EXISTING) <br />YR. <br />FLOODWAY <br />I111111 <br />I I I <br />I I I I <br />II I <br />�1 1 <br />1 <br />II I <br />( <br />1 <br />0 <br />i <br />i <br />i <br />100 YR. <br />FLOODWAY <br />I' J <br />/--flBER OPTIC MH / <br />(DO NOT DISTURB) <br />/ `APP. R <br />� W <br />CITY OF SOUTH BEND <br />It <br />STRUCTUREPOINT <br />• River Road I SO, 2001 Indianapolis, Indiana 46240 <br />— 31].54].5580I FAX 31-3.0270 <br />�a�,�arep�aLeom <br />ST. JOSEPH RIVER <br />I I <br />APP. R <br />IN TEK STRUCTURE <br />ST. JOSEPH RIVER <br />/ PROPOSED / <br />OVERFLOW STRUCTURE j <br />i <br />/ <br />PROPOSED / <br />/ DIVERSION STRUCTURE / <br />i <br />r / <br />100 YR. / <br />FLOOD EL. 668 / <br />/ <br />i <br />SOUTH BEND <br />CSO 045 EQ BASIN <br />AT WWTP <br />SOUTH BEND, INDIANA <br />XXIXX120XX <br />CERTIFIED BY <br />ISSUANCE INDEX <br />DATE: <br />3131 /2023 <br />PROJECT PHASE: <br />60% PLANS <br />Project Number 202001456 <br />SITE PLAN <br />)SED CONDITI <br />C-07 <br />