My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 2:05:00 PM
Creation date
6/13/2023 2:04:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 <br />(Exhibit C – Compensation Decision Guide) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br /> <br /> <br />3. Compensation for Additional Services (as described in Exhibit A, Part 2) <br /> <br /> Decision Question: Which method of compensation is to be used? <br /> <br /> Standard Hourly Rates Direct Labor Costs <br />Times a Factor <br />Salary Costs Times <br />a Factor <br />Use This Additional <br />Services <br />Compensation <br />Packet <br />Packet AS-1 Packet AS-2 Packet AS-3 <br />Include This <br />Appendix Appendices 1 and 2 Appendix 1 Appendix 1 <br /> <br />Example: If Basic Services (other than RPR) will be compensated using Lump Sum; RPR services using Direct Labor Times a <br />Factor; and Additional Services using Standard Hourly Rates; then use Packet BC-1; Packet RPR-4; Packet AS-1; and <br />Appendices 1 and 2 to form Exhibit C.
The URL can be used to link to this page
Your browser does not support the video tag.