My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 2:05:00 PM
Creation date
6/13/2023 2:04:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 1 <br />(Exhibit C – Compensation Decision Guide) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />1. Compensation for Basic Services (not including Resident Project Representative) (as described in Exhibit A, Part I) <br /> <br /> Decision Question: Which method of compensation is to be used? <br /> <br /> Lump <br />Sum <br />Standard Hourly <br />Rates <br />Percentage of <br />Construction <br />Costs <br />Direct Labor <br />Costs Times a <br />Factor <br />Direct Labor <br />Costs Plus <br />Overhead Plus a <br />Fixed Fee <br />Salary Costs <br />Times a Factor <br />Use This Base <br />Compensation <br />Packet <br />Packet <br />BC-1 Packet BC-2 Packet BC-3 Packet BC-4 Packet BC-5 Packet BC-6 <br />Include This <br />Appendix N/A Appendices 1 and 2 N/A Appendix 1 Appendix 1 Appendix 1 <br /> <br />2. Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) <br /> <br /> Decision Question: Which method of compensation is to be used? <br /> <br /> <br />Lump Sum Standard Hourly <br />Rates <br />Percentage of <br />Construction <br />Costs <br />Direct Labor Costs <br />Times a Factor <br />Salary Costs Times a <br />Factor <br />Use This RPR <br />Compensation <br />Packet <br />Packet RPR-1 Packet RPR-2 Packet RPR-3 Packet RPR-4 Packet RPR-5 <br />Include This <br />Appendix N/A Appendices 1 <br />and 2 N/A Appendix 1 Appendix 1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> COMPENSATION DECISION GUIDE FOR USE WITH EXHIBIT C TO EJCDC E-500, 2008 EDITION Compensation Decision Guide for Use with Exhibit C to EJCDC E-500, 2008 Edition Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
The URL can be used to link to this page
Your browser does not support the video tag.