My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Central Services Parking Lot Rehab Proj No. 122-064 - NO QUOTES
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Central Services Parking Lot Rehab Proj No. 122-064 - NO QUOTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 1:57:29 PM
Creation date
6/13/2023 1:57:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 03/15/2023 Page - 8 Public Works Quote <br />4. The Contractor shall be responsible for all surface preparation necessary to meet the <br />performance requirements for warranted seal coating. All castings and detector housings shall be <br />protected prior to the application of material in accordance with INDOT 404.07, except that raised <br />pavement markers shall be removed. There will be no direct payment for this work. <br />5. Cracks in the pavement in excess of 1/4 in. width shall be filled in accordance with INDOT 408 <br />prior to placement of warranted seal coating. There will be no direct payment for this work. <br />6. Existing curb faces, approaches, stormwater inlets, grass, and other features subject to <br />coordination with the Engineer shall be protected from and kept clean of all asphalt seal coat <br />material. <br />7. Squeegees, brushes, and truck-mounted applicators shall be permitted for this work. Only <br />application by hand squeegee or brush shall be used in the vicinity of existing curb faces, <br />approaches, stormwater inlets, grass, and other features to prevent contamination. <br />8. Seal coat shall not be applied when ambient temperature is below 50°F nor when ambient <br />temperature is expected to drop below 50°F within 24 hours of application. <br />9. The application rate of the seal coat shall be between 70 to 82 square feet per gallon. <br />10. All incidental work, including but not limited to surface preparation, inlet and casting protection, <br />and pavement markings, shall be included in the cost of the seal coat pay item: <br />Seal Coat …………………………………… SY <br /> <br />XXVI. CONCRETE CURB, INSTALLATION <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 605 <br />B. Additions: <br />1. The pay item Concrete Curb, Installation shall include installing new curb in accordance with the <br />plans and special provisions herein. <br />2. The Contractor shall minimize the area of disturbances not included in the plans. All areas <br />disturbed within the right of way that are not paved shall receive Kentucky Bluegrass seeding or <br />an approved mixture of Kentucky Bluegrass. The seeding shall be applied in a mixture of water <br />and mulching material in accordance with INDOT Standard Specifications section 621. The <br />Contractor is responsible for watering for thirty (30) days after placement of the seed. The cost of <br />seeding and watering will not be paid for separately, but shall be included in the cost of the <br />concrete curb. <br />3. Expansion material is required at all cold joints and every 80 ft. <br />4. Control joints are to be placed at equal intervals not exceeding 10 ft. <br />5. The Contractor shall ensure that adequate drainage exists once new concrete curbs are installed. <br />The Contractor shall ensure that low spots do not exist and that water can flow to existing inlets <br />similar to pre-existing conditions. <br />6. If tree roots are encountered and must be removed due to grades, the Contractor shall contact a <br />representative from the City of South Bend Engineering Division. Tree roots shall not be removed <br />without the on-site approval of the Engineer. The cost of root removal shall not be paid for <br />separately but shall be included on the cost of other items.
The URL can be used to link to this page
Your browser does not support the video tag.