Laserfiche WebLink
b. WBE 5.31 %. <br />2. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit <br />with Bid Proposal <br />3. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of Good Faith <br />Efforts and submit with Bid Proposal. <br />4. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit with Bid <br />Proposal. <br />XXVII. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 3 sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The Contractor is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall <br />govern. <br />Version 03/15/2023 Page - 12 Public Works Quote <br />