Laserfiche WebLink
PAGE 7 CITY OF SOUTH BEND <br />MARKET DISTRICT IMPROVEMENT PROJECT <br />SIMILAR PROJECT EXPERIENCE <br />CRIMINAL JUSTICE CENTER CAMPUS INDIANAPOLIS, INDIANA <br />LEADERSHIP FROM KEY STAFF <br />Zielinski (project manager); Sessions (roadway); <br />O’Connor, Rajbhara (traffic); Hope, Iddings <br />(environmental) <br />American Structurepoint is providing <br />comprehensive engineering services for the <br />preparation of road and traffic design plans, <br />including preliminary opinions of probable costs, <br />for improvements of various roadways and <br />intersections surrounding the new Indianapolis <br />Community Justice Campus near Southeastern <br />Avenue and Pleasant Run Parkway in Marion <br />County. These improvements include a new <br />2-lane roundabout at Southeastern Avenue/ <br />English Avenue/Rural Street; 4 lanes of full-depth <br />pavement replacement along Southeastern <br />Avenue from Rural Street to Pleasant Run Parkway; <br />resurfacing and widening of Southeastern Avenue <br />from Pleasant Run Parkway to the CSX Railroad <br />Bridge; new traffic signals at the Community Justice <br />Campus main entrance on Pleasant Run Parkway <br />and at the Southeastern Avenue and Pleasant <br />Run Parkway intersection; and realignment of <br />English Avenue near the roundabout. The project <br />also includes the addition of sidewalks, ADA <br />curb ramps, an enclosed storm sewer system, <br />underground detention system, curb and gutter, a <br />multi-use trail, and lighting. <br />INFOSYS DEVELOPMENT PUBLIC INFRASTRUCTURE – PHASE 1 <br />INDIANAPOLIS, INDIANA <br />LEADERSHIP FROM KEY STAFF <br />Murphy (project manager); Canfield (principal); <br />Bosse, Zielinski (roadway); Grimmer, O’Connor, <br />Rajbhara (traffic); Hope, Iddings (environmental) <br />Douglass (survey); Stapleton (ROW) <br />American Structurepoint provided the design <br />for this roadway widening and intersection <br />improvement project at the new Infosys US <br />Education Center facility under construction at <br />the former Indianapolis International Airport <br />site. Infosys plans to use this facility to train all <br />US workforce. The project includes the design <br />of pavement, traffic signals, lighting design, <br />overhead sign structures, drainage structures, <br />pavement markings, signage, curb and sidewalks, <br />and maintenance of traffic during construction. <br />The work includes preliminary engineering, <br />alternative analysis, environmental documentation <br />preparation and permitting, topographic/route <br />survey, right-of-way engineering, land acquisition, <br />construction documents, maintenance of traffic, <br />and utility coordination. <br />AMERICAN STRUCTUREPOINT WORKS FOR SOUTH BEND <br />• Safe Routes to School <br />• Boland Drive Multi-Use Path <br />• Signal System Inventory <br />• Pinhook Water Treatment Plant <br />Improvements Progressive Design-Build <br />• St. Joseph River CSO/River Stabilization <br />• Wellhead Protection Plan Update