My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - 2023 Splashpad Renovations Southeast & Coquillard Parks – WBK Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - 2023 Splashpad Renovations Southeast & Coquillard Parks – WBK Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2023 2:24:32 PM
Creation date
5/9/2023 2:24:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/9/2023
Stamp
ID:
1
Creator:
Created:
5/9/2023 2:24 PM
Modified:
5/9/2023 2:24 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
order review as well as project close out. Manhour budgets are estimated based on potential <br />involvement and expected to be limited. No field observations or materials testing is included in this <br />Task. <br />Assumptions: <br />• Two splashpad areas to be inspected but a formal report is not necessary. <br />• No boundary work performed <br />• One site visit is included in the scope. Additional field / site visits can be accommodated as a <br />supplemental service. <br />• No hazardous materials anticipated, and no evaluation or remediation included <br />• In general drainage provisions exist nearby and no significant utility improvements are <br />necessary for water feature operation. <br />• Construction support is limited and does not include field visits or observations.
The URL can be used to link to this page
Your browser does not support the video tag.