Opening of Quotes - South Bend Fire Department Parking Lot Rehab Proj No. 123-049 - Asphalt Restoration Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - South Bend Fire Department Parking Lot Rehab Proj No. 123-049 - Asphalt Restoration Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:44:22 AM
Creation date
5/9/2023 2:17:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
designate a random location for all samples and density tests to be performed by a representative <br />from the testing lab. The representative from the testing lab will be required to sign the City's <br />chain of custody form prior to leaving the site with the samples and density information. <br />5. A minimum of one (1) plate sample, for each type of mix placed shall be taken for each day that <br />fifty (50) tons is placed. <br />6. If test results for mixture properties and density do not meet allowable tolerances, adjustment pay <br />factors shall be assessed in accordance with Section 401.19. <br />7. The temperature of the finished mixture at the plant shall be 2607 with a minimum temperature <br />at time of spreading of 240'17, <br />8. The use of RAS is not permitted in the surface mix. <br />9. The binder shall be PG 64-22P in the HMA surface mix. The coarse aggregate in the mix shall <br />only be limestone. The HMA surface mix size shall be 9.5 mm. <br />10. The application rate for the HMA surface layer shall be 165 LB/SY. <br />11. Joint adhesive shall be applied to longitudinal joints constructed between two adjacent HMA <br />courses. There will be no direct payment for this work. <br />12. The Contractor shall properly cover all existing structures (storm water inlets, open grate manhole <br />covers, etc.) prior to applying HMA surface. All existing structures not covered prior to application <br />shall be cleaned at no additional cost to the Owner. <br />13. Any existing structure (including storm inlets) in the resurfacing area that requires adjustment <br />shall be adjusted to match the finished grade. There will be no direct payment for this work. <br />14. The Contractor is responsible for identifying all structures and water valves to be adjusted and <br />confirming them, along with the method of adjustment, with the City. There will be no direct <br />payment for this work. <br />15. The Contractor shall provide weigh tickets to the City representative for payment of HMA used <br />during work. Payment shall be made at the Unit Price as specified in the proposal as follows: <br />Hot Mix Asphalt Surface, 9.5mm—Type B.......................................... TONS <br />XXI. SEAL COAT <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 404 <br />B. Additions: <br />1. The seal coat used shall be type 1 as defined by 2022 INDOT Standard Specifications 404.04. <br />2. The Contractor shall properly cover all existing structures (storm water inlets, open grate manhole <br />covers, etc.) prior to applying seal coat. All existing structures not covered prior to application <br />shall be cleaned at no additional cost to the Owner. <br />3. Seal coat shall be constructed according to a quality control plan, QCP, prepared and submitted <br />by the Contractor in accordance with ITM 83; Contractor Quality Control Plan for Seal Coat. The <br />QCP shall be submitted to the City at least 15 days prior to commencing seal coat operations. <br />4. The Contractor shall be responsible for all surface preparation necessary to meet the <br />performance requirements for warranted seal coating. All castings and detector housings shall be <br />Version 03/15/2023 Page - 7 Public Works Quote <br />Scanned with CamScanner <br />