My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - South Bend Fire Department Parking Lot Rehab Proj No. 123-049 - Asphalt Restoration Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - South Bend Fire Department Parking Lot Rehab Proj No. 123-049 - Asphalt Restoration Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:44:22 AM
Creation date
5/9/2023 2:17:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Compaction shall be applied prior to applying any HMA surface material. <br />10. Payment for the excavation, removal, compaction, labor, and materials shall be included in the <br />Unit Price cost as specified in the proposal as follows: <br />Hot Mix Asphalt Patch .......................................... SFT <br />XXIII. PAVEMENT MARKINGS PAINT <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 808, and MUTCD Section <br />3B.19 and 3B.22 <br />B. Additions: <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to apply pavement markings as shown in the exhibits. <br />2. Existing pavement markings, including but not limited to parking and backing lines, where paved <br />over by seal coat or HMA, shall be reapplied with traffic paint. <br />3. Additional pavement markings as noted in plans shall be applied with traffic paint after pavement <br />rehabilitation. <br />4. Accessible parking spaces designated as shown in plans shall be marked according to prevailing <br />specifications. <br />5. The material shall be warranted to retain color and adherence to the pavement for 180 days from <br />substantial completion. <br />6. The Contractor shall confirm the location of all pavement markings with the Owners inspector <br />prior to painting. <br />7. Payment shall be made at the Unit Price as specified in the proposal as follows: <br />Line, Paint, Solid, White, 4.. .......................................... LFT <br />Line, Paint, Solid, White, 6".......................................... LIFT <br />Line, Paint, Solid, Yellow, 4".......................................... LFT <br />Line, Paint, Solid, Blue, 4".......................................... LFT <br />ADA Parking Space Marking .......................................... EA <br />XXIV. STATIONARY STEEL BOLLARD <br />A. Prevailing Specifications: None. <br />B. Additions: <br />1. Descriptions: <br />a. This work shall include all material and labor required to install stationary steel pipe bollards. <br />2. Bollards shall be painted yellow. <br />Version 03/15/2023 Page - 9 Public Works Quote <br />Scanned With CamScanner <br />
The URL can be used to link to this page
Your browser does not support the video tag.