Laserfiche WebLink
BID/PROPOSAL ,"M <br />CITY OF SOUTH BEND <br />w aJ <br />. <br />a'5 _ x <br />PROJECT NAME: 2021 Drainage Improvements - BID B <br />PROJECT NO. 121-006B <br />FOR BIDS DUE: May 9, 2023 <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />DIVISION 2 — CHAPIN STREET IMPROVEMENTS <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LSUM <br />3,831.00 <br />$3,831.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />1 <br />LSUM <br />LSUM <br />9,900.00 <br />$9,900.00 <br />3 <br />MAINTENANCE OF TRAFFIC <br />11,600.00 <br />$11,600.00 <br />4 <br />VIDEO RECORD <br />1 <br />LSUM <br />900.00 <br />$900.00 <br />5 <br />CLEARING OF RIGHT-OF-WAY (W/IN <br />PROJECT LIMITS) <br />1 <br />LSUM <br />10,200.00 <br />$10,200.00 <br />6 <br />CONCRETE, PAVEMENT REMOVE <br />112 <br />SYS <br />39.00 <br />$4,368.00 <br />7 <br />CONCRETE, CURB REMOVE <br />200 <br />LFT <br />28.00 <br />$5,600.00 <br />8 <br />SURFACE MILLING, ASPHALT 1.5 IN <br />775 <br />SIFT <br />15.00 <br />$11,625.00 <br />9 <br />COMMON EXCAVATION, ASPHALT REMOVE <br />215 <br />SYS <br />40.00 <br />$8,600.00 <br />10 <br />CLEAR AND GRUB <br />1240 <br />SIFT <br />4.00 <br />$4,960.00 <br />11 <br />ITREE REMOVE <br />4 <br />EACH <br />1,250.00 <br />$5,000.00 <br />12 <br />COMPACTED AGGREGATE, No. 53 <br />35 <br />CYS <br />210.00 <br />$7,350.00 <br />13 <br />HMA SURFACE, TYPE B, 1.5" <br />25 <br />TON <br />550.00 <br />$13,750.00 <br />14 <br />HMA INTERMEDIATE, TYPE B, 2.5" <br />30 <br />TON <br />325.00 <br />$9,750.00 <br />15 <br />HMA BASE, TYPE B, 4" <br />48 <br />TON <br />280.00 <br />$13,440.00 <br />16 <br />SIDEWALK, CONCRETE, 4 IN <br />120 <br />SYS <br />164.00 <br />$19,680.00 <br />17 <br />CONCRETE CURB <br />200 <br />LIFT <br />116.00 <br />$23,200.00 <br />18 <br />DRYWELL STRUCTURE, 3600 GAL <br />1 <br />EACH <br />16,200.00 <br />$16,200.00 <br />19 <br />TURF SOD, AND TOPSOIL <br />138 <br />SYS <br />67.00 <br />$9,246.00 <br />20 <br />OVERSTORY TREE, 2-1/2" CAL <br />5 <br />EACH <br />750.00 <br />$3,750.00 <br />21 <br />TREE WATERING BAG <br />5 <br />EACH <br />30.00 <br />$150.00 <br />22 <br />TEMPORARY EROSION CONTROL <br />1 <br />LSUM <br />900.00 <br />$900.00 <br />DIVISION 2 TOTAL <br />$194,000.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />