Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />U t7 <br />=.Piv Act <br />i <br />1865 <br />PROJECT NAME: 2021 Drainage Improvements - BID B <br />PROJECT NO. 121-006B <br />FOR BIDS DUE: May 9, 2023 <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />DIVISION 1 — BEALE STREET IMPROVEMENTS <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING AND <br />STAKING <br />1 <br />LSUM <br />4,485.00 <br />$4,485.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LSUM <br />9,900.00 <br />$9,900.00 <br />3 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LSUM <br />12,600.00 <br />$12,600.00 <br />4 <br />VIDEO RECORD <br />1 <br />LSUM <br />900.00 <br />$900.00 <br />5 <br />CLEARING OF RIGHT-OF-WAY (W/IN <br />PROJECT LIMITS) <br />1 <br />LSUM <br />12,000.00 <br />$12,000.00 <br />6 <br />CONCRETE, PAVEMENT REMOVE <br />105 <br />SYS <br />40.00 <br />$4,200.00 <br />7 <br />CONCRETE, CURB REMOVE <br />178 <br />LFT <br />25.00 <br />$4,450.00 <br />8 <br />SURFACE MILLING, ASPHALT 1.5 IN <br />1065 <br />SIFT <br />13.00 <br />$13,845.00 <br />9 <br />COMMON EXCAVATION, ASPHALT REMOVE <br />176 <br />SYS <br />45.00 <br />$7,920.00 <br />10 <br />ICLEAR AND GRUB <br />1620 <br />SIFT <br />2.20 <br />$3,564.00 <br />11 <br />TREE REMOVE <br />4 <br />EACH <br />2,200.00 <br />$8,800.00 <br />12 <br />COMPACTED AGGREGATE, No. 53 <br />30 <br />CYS <br />210.00 <br />$6,300.00 <br />13 <br />HMA SURFACE TYPE B, 1.5" <br />25 <br />TON <br />550.00 <br />$13,750.00 <br />14 <br />HMA INTERMEDIATE, TYPE B, 2.5" <br />25 <br />TON <br />332.00 <br />$8,300.00 <br />15 <br />HMA BASE, TYPE B, 4" <br />40 <br />TON <br />280.00 <br />$11,200.00 <br />16 <br />SIDEWALK, CONCRETE, 4 IN <br />103 <br />SYS <br />166.00 <br />$17,098.00 <br />17 <br />CONCRETE CURB <br />178 <br />LFT <br />116.00 <br />$20,648.00 <br />18 <br />PVC STORM SEWER PIPE, 10 IN <br />60 <br />LFT <br />200.00 <br />$12,000.00 <br />19 <br />MORTAR -SEAL EXISTING PIPE IN <br />STRUCTURE <br />1 <br />EACH <br />5,000.00 <br />$5,000.00 <br />20 <br />STORM INLET <br />1 <br />EACH <br />6,000.00 <br />$6,000.00 <br />21 <br />TURF SOD, AND TOPSOIL <br />180 <br />SYS <br />60.00 <br />$10,800.00 <br />22 <br />OVERSTORY TREE, 2-1/2" CAL <br />4 <br />EACH <br />805.00 <br />$3,220.00 <br />23 <br />TREE WATER BAG <br />4 <br />EACH <br />30.00 <br />$120.00 <br />24 <br />TEMPORARY EROSION CONTROL <br />1 <br />LSUM <br />900.00 <br />$900.00 <br />DIVISION I TOTAL <br />$198,000.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />