My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - 2023 Asphalt Materials Bid Proj No. 123-020 - Milestone Contractors North, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - 2023 Asphalt Materials Bid Proj No. 123-020 - Milestone Contractors North, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 2:37:56 PM
Creation date
4/11/2023 3:03:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2023
Stamp
ID:
1
Creator:
Created:
4/11/2023 3:04 PM
Modified:
4/11/2023 3:04 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID TABULATION <br />2023 Asphalt Material Bid <br />Project No: 123-020 <br />For Bids Due: March 28, 2023 <br />BASE BID - ASPHALT MATERIALS <br />Item No. Description Quantity Unit <br />A-1 <br />HMA Surface Type B, 9.5mm, PG 64-28P <br />5000 <br />TON <br />A-2 <br />HMA Surface Type B, 9.5mm, PG 70-22P <br />17500 <br />TON <br />A-3 <br />HMA Binder 11 <br />22500 <br />TON <br />A-4 <br />HMA Base 5D <br />3000 <br />TON <br />A-5 <br />CMA Patch AE-300P <br />500 <br />TON <br />A-6 <br />High Performance Cold Mix <br />250 <br />TON <br />BASE BID TOTAL <br />Engineer's Estimate <br />Unit Price Item Total <br />Milestone Contractors North, <br />Inc. <br />Unit Price Item Total <br />Rieth Riley Construction Co., Inc. <br />Unit Price Item Total <br />$ <br />76.00 <br />$ <br />380,000.00 <br />$ <br />72.00 <br />$ <br />360,000.00 <br />$ <br />73.00 <br />$ <br />365,000.00 <br />$ <br />76.00 <br />$ <br />1,330,000.00 <br />$ <br />72.00 <br />$ <br />1,260,000.00 <br />$ <br />73.00 <br />$ <br />1,277,500.00 <br />$ <br />70.00 <br />$ <br />1,575,000.00 <br />$ <br />62.75 <br />$ <br />1,411,875.00 <br />$ <br />67.00 <br />$ <br />1,507,500.00 <br />$ <br />52.00 <br />$ <br />156,000.00 <br />$ <br />52.00 <br />$ <br />156,000.00 <br />$ <br />49.00 <br />$ <br />147,000.00 <br />$ <br />90.00 <br />$ <br />45,000.00 <br />$ <br />130.00 <br />$ <br />65,000.00 <br />$ <br />115.00 <br />$ <br />57,500.00 <br />$ <br />105.00 <br />$ <br />26,250.00 <br />$ <br />130.00 <br />$ <br />32,500.00 <br />$ <br />115.00 <br />$ <br />28,750.00 <br />$ 3,512,250.00 <br />$ 3,285,375.00 <br />$ 3,383,250.00 <br />Non -Collusion Affadavit <br />N/A <br />Y <br />Y <br />Addendum #1 <br />N/A <br />Y <br />Y <br />I hereby certify that the above truly and accurately represents bids received for this project on March 28, 2023 <br />Scott Kreeger, Project Engineer <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.