My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Beck’s Lake LaSalle Park EPA Master Plan Proj No. 120-053 - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 2 - Beck’s Lake LaSalle Park EPA Master Plan Proj No. 120-053 - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:11:12 PM
Creation date
2/14/2023 1:19:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Itarn No. <br />Lines Item <br />Currant Qlv <br />Qt <br />Unit <br />Unit Prices <br />1 <br />MOBILIZATION ANO UEMOBILIZATION <br />1 <br />1 <br />LS <br />$110 000.00 <br />2 <br />MAINTAINING TRAFFIC <br />1 <br />1 <br />LS <br />$B 500.00 <br />3 <br />CONSTRUCTION ENGINEERING <br />1 <br />1 <br />LS <br />$15 000.00 <br />4 <br />N/IDEO RECORO - <br />1 <br />1 <br />LS <br />$1 500.00 <br />5 <br />CLEAR AND GRUB TURF SOO MAX 2" OEPTH <br />47815 <br />49848 <br />SYS <br />$3.50 <br />6 <br />TREE REMOVE <br />18 <br />18 <br />EA <br />$925.00 <br />7 <br />EXISTING PLAYGROUNO EQUIPMENT REMOVE/RELOCATE <br />1 <br />1 <br />LS <br />$15 000.00 <br />8 <br />ADJUST BACKSTOP FENCING PLACE BASES <br />1 <br />1 <br />LS <br />$8 000.00 <br />9 <br />TEMPORARY EROSION CONTROL <br />1 <br />1 <br />LS <br />$38 000.00 <br />10 <br />COMMON EXCAVATION <br />1950 <br />1700 <br />CYS <br />$60.00 <br />11 <br />UECO NTAMINATION <br />1 <br />1 <br />LS <br />$43 500.00 <br />12 <br />GEOTEXTILE FABRIC <br />47815 <br />50343 <br />SYS <br />$2.50 <br />13 <br />BORROW <br />12995 <br />15771 <br />CYS <br />$36. 95 <br />14 <br />INFIELO MIX <br />110 <br />110 <br />CYS <br />$500.00 <br />15 <br />_ _ <br />GRAVEL AGGREGATE NO 53 <br />_ <br />62 <br />26 <br />CYS <br />$120.00 <br />16 <br />OVERSTORY TREE 2 1/2 IN CALIPER <br />36 <br />36 <br />EA <br />$810.00 <br />17 <br />SODDING. NURSERYANO TOPSOIL <br />15450 <br />15450 <br />SYS <br />$13.00 <br />18 <br />SEEDING, HYOROMULCH AND TOPSOIL <br />32415 <br />34839 <br />SYS <br />$6.00 <br />19 <br />IRRIGATION LINE REPLACEMENT <br />1 <br />1 <br />LS <br />$20 000.00 <br />20 <br />IRRIGATION HEAO ADJUSTMENT <br />1 <br />1 <br />LS <br />$65 230.00 <br />21 <br />TREE WATERING SYSTEM <br />36 <br />36 <br />EA <br />$50.00 <br />22 <br />1 FENCE RESETTING STUMP AREAS IN AOC 2 8 3 <br />1 <br />1 <br />LS <br />i $6 806J0 <br />updated Cost <br />Chan a <br />Roason <br />$110 000.00 <br />$B 500.00 <br />$15 000.00 <br />$1 500.00 <br />$174 468.00 <br />$7 115.50 <br />Quantit Adjustment <br />$16 650.00 <br />$15 000.00 <br />B 000.00 <br />$3B 000.00 <br />$102 000.00 <br />-$15 000.00 <br />Ounntitv Ad'ustman[ <br />$43 500.00 <br />$125 857.50 <br />$6 320.00 <br />Quantit Ad"ustmanI <br />$582,738.45 <br />$102 573.20 <br />OwnarA rovatl Cnan a Soccer Field Lavalin <br />$55.000.00 <br />$3.120.00 <br />-$4 320.00 <br />Quantity Adjustment <br />$29 160.00 <br />$200 B50.00 <br />$209 034.00 <br />$14 544.00 <br />Quanta Ad ustman[ <br />$20 000.00 <br />$65 230.00 <br />1 800.00 <br />S1,022 <br />$6 SOBJO <br />1 832 216.68 111 232.70 <br />Raaaon Total Changes <br />Quantity Adjustment $8, 659. 50 <br />Owner Approved Chan9a $102,573.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.