My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - MarMain Apartments Roof Replacement Proj No. 122-061 - Slatile Roofing & Sheet Metal Co.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - MarMain Apartments Roof Replacement Proj No. 122-061 - Slatile Roofing & Sheet Metal Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 10:00:41 AM
Creation date
2/14/2023 1:18:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
uTH INTER -OFFICE MEMORANDUM <br />r <br />U\ <br />DEPARTMENT OF PUBLIC WORKS <br />x �4i5 k DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, Project Engineer <br />SUBJECT: Award Bid - Project No. 122-061 <br />MarMain Apartments Roof Replacement <br />DATE: 02/01 /2023 <br />On January 24, 2023, the Board of Public Works opened and read bids for the above project. <br />Two bids were received, from Slatile Roofing and Sheet Metal, and Midland Engineering. The <br />bids were reviewed and found complete and responsive. A breakdown of the bids is as follows: <br />Contractor: <br />Slatile Roofing and <br />Sheet Metal <br />Midland Engineering <br />Base Bid: <br />$434,812.00 <br />$440,600.00 <br />Alternate Item: <br />$1,200.00 <br />$2,500.00 <br />TOTAL: <br />$436,012.00 <br />$443,100.00 <br />UNIT PRICE: Roof Drain Replacement: <br />$3,200.00 <br />$750.00 <br />UNIT PRICE: '/2" Plywood Replacement: <br />$235.00 <br />$225.00 <br />UNIT PRICE: V Plywood Replacement: <br />$275.00 <br />$250.00 <br />During review of the bids, Midland Engineering noted that if three (3) or more roof drains <br />required replacement, they would become the low bid. However, upon consultation with Forum <br />Architects, the City's architect for this project, it was noted that roof drain replacement is an <br />unforeseen condition. It is not possible to determine if a roof drain requires full replacement until <br />the construction work has begun and the existing bolts are removed. A copy of that <br />correspondence is included in this bid award package. <br />MWBE Analysis: <br />MBE goal: 0.6% <br />• Met via JMH Roofing Company: $8,696.00 (2.0%) <br />WBE goal: 2.1 % <br />Met via JMH Roofing Company: $17,392.00 (4.0%) <br />I recommend award of the base bid and alternate item for MarMain Apartments Roof <br />Replacement to Slatile Roofing and Sheet Metal Co. Inc., in the amount of $436,012.00. <br />Funding is available through PR-00021364. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.