Laserfiche WebLink
PAGE 3 <br />TEAM <br />KENNEDY SCHOOL SFTS <br />Stephan and Jonathon have worked closely through <br />the management and development of many projects. <br />They form a dynamic, responsive team whose goal is <br />to make our partner’s lives easier. <br />Together, Stephan and Jonathon will determine the <br />best team to fit the needs of this sidewalk project. They <br />will draw upon their extensive experience managing <br />local contracts to aid South Bend in maximizing the <br />value of this project. They are adept in assessing <br />sidewalk and streetscape related issues that arise by <br />defining the impacts to safety, long term maintenance, <br />budget, and schedule of possible solutions; ensuring <br />that the correct design is incorporated in the plan set. <br />TEAM LEADERSHIP <br />Commitment <br />Stephan and Jonathon are fully committed to this <br />project and will participate in 100% of the key <br />decisions, ensuring that the City of South Bend has the <br />tools they need to most effectively serve its citizens. <br />28 <br />12 <br />19 <br />REGIONAL MULTI-USE PATHWAY PROJECTS <br />SAFE ROUTES TOSCHOOL AND SIDEWALKPROJECTS <br />STREETSCAPEMUNICIPALPROJECTS <br />PEDESTRIAN INFRASTRUCTURE DESIGN + CONSTRUCTION LEADERSHIP EXPERIENCE <br />As a project manager, Stephan has a reputation for <br />managing complex and challenging projects, ensuring <br />that they meet all design, schedule, and budget <br />goals. Importantly, he is extensively familiar with LPA <br />processes and contract management. <br />Stephan is known for his consistent and effective <br />communication. He utilizes all appropriate channels <br />to ensure the Town has all of the project information <br />at their fingertips. If risks arise, they will be <br />communicated to all stakeholders in a prompt and <br />concise manner with solutions to keep the project <br />moving forward. <br />Stephan brings a wealth of experience managing <br />hundreds of transportation projects, both with <br />municipalities and with the state, including ones <br />under the jurisdiction of FHWA, INDOT, and IDEM. His <br />ability to coordinate all aspects of the design process <br />will make the Kennedy School SRTS project a success. <br />Related Experience: <br />• Muessel/Holy Cross SRST - South Bend, IN <br />• CR300 N Ped. Improvements - Warsaw, IN <br />• Lincoln Neighborhood Sidewalks - Warsaw, IN <br />• ADA Curb Ramps along SR23 - Various Co., IN <br />• ADA Curb Ramps along US6 - Various Co., IN <br />• West Jefferson Streetscape - Culver, IN <br />• West Jefferson Streetscape Inspection - Culver, IN <br />• SR 10 Sidewalks Inspection - Culver, IN <br />• Park St. Reconstruction - La Porte, IN <br />• Lake Max Trail Ph. 2 - Culver, IN <br />• Lake Max Trail Ph. 2 Inspection - Culver, IN <br />• Indiana Ave. Reconstruction - Goshen, IN <br />• Miriam Ave Streetscape - Nappanee, IN <br />• US 41 Corridor Plan - Cedar Lake, IN <br />• Auten Trail Inspection - St. Joseph Co., IN <br />• US 41 Aux Lanes/Corridor Imp. - Lake Co., IN <br />Project Manager <br />B.S. Construction Management, 2014 <br />A.S. Civil Engineering, 2013, Purdue <br />University <br />Principal-in-Charge <br />B.L.A. - Ball State University <br />M.B.A - University of Notre Dame (ex. 2023) <br />Professional LA: IN <br />Stephan Summers Jonathon Geels, PLA, FASLA <br />As Principal-in-Charge, Jonathon will oversee all <br />aspects of the project. He brings <br />As a landscape architect, Jonathon works on public <br />sites with a focus on pedestrian experiences and <br />community engagement. He has been very involved <br />with the Safe Routes to School program, advocating for <br />more complete transportation infrastructure funding, <br />specifically through his efforts with the American <br />Society of Landscape Architects. <br />Jonathon is very familiar with the Kennedy Park area, <br />particularly through his work with South Bend on the <br />City Cemetery Master Plan. His oversight, experience <br />working within the neighborhood, and expertise in <br />pedestrian transportation planning as a landscape <br />architect ensures that all aspects of this project are <br />considered. <br />Related Experience: <br />• Harrison SRTS - South Bend, IN <br />• LaSalle Marquette SRTS - South Bend, IN <br />• VPA Parks ADA Improvements - South Bend, IN <br />• Erie Trail Extension - Starke County, IN <br />• Adams Trail Phase II- Granger, IN <br />• Vale Park West Path - Valparaiso, IN <br />• 300 N Trail - Warsaw, IN <br />• Merrifield Park and Trail - Mishawaka, IN <br />• Lake Maxinkuckee Trail Phase I - Culver, IN <br />• 100 Wayne Plaza + Streetscape - South Bend, IN <br />• Lake Max Trail Ph. 2 - Culver, IN <br />• Lake Maxinkuckee Trail Master Plan - Culver, IN <br />• Land-Use and Connectivity Study - Porter Co., IN <br />• Bike and Pedestrian Master Plan - Gary, IN <br />• Sterling E. Multi-use Trail Master Plan - Elkhart, IN <br />• Enviro. Center Trail Master Plan - Elkhart, IN <br />• City Cemetery Master Plan - South Bend, IN