Laserfiche WebLink
<br /> <br /> ENGINEERING • ARCHITECTURE • LAND SURVEYING <br />TECHNICAL APPROACH <br />PROJECT SCHEDULE <br />Based on our experience on similar projects, we have programed the sequence and duration of the tasks that <br />need to be performed. Below is our proposed schedule: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />The primary elements that drive the overall schedule and the timing of the letting are: <br /> <br />• Environmental Clearance <br />• Utility Coordination <br /> <br />PROPOSED PROJECT SCHEDULE <br />TASKS 2023 2024 <br /> Notice to Proceed <br /> Topographical Survey <br /> Stage 1 Plans <br /> Preliminary Field Check <br /> Environmental Document <br /> Utility Coordination <br />Stage 3 Plans <br />Final Tracings <br />Letting <br /> <br />7