My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Safe Roads to School Kennedy School - A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - Safe Roads to School Kennedy School - A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 1:15:30 PM
Creation date
2/14/2023 1:15:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The City of South Bend Safe Routes to School: Kennedy School Des No. 2201237 9 <br />The City of Angola, IN: SRTS <br />• Project Cost: $250K <br />• A&Z Key Staff: Jamal Anabtawi, PE, Landon Grogg, EI <br />• Client Contact: Bill Boyer, PE | City Engineer | City of Angola | 260 -665- <br />6748 <br />• Stu Hamblen | City of Angola | 260-665-2121 <br />... A&Z Engineering and the City of Angola have partnered on three (3) SRTS Projects. The first project was a non - <br />infrastructure project and A&Z assisted the City from the application stage through to the completion of the pro- <br />ject. The A&Z staff has moved all three (3) projects from funding to realization in a timely manner and the City is very <br />satisfied with the service received from all members of the A&Z staff. <br /> <br />- Bill Boyer | City Engineer: Angola, IN <br />A&Z Engineering completed a Comprehensive Travel Plan to identify <br />designated walking routes for several SRTS projects in Angola, IN. These included <br />elementary, middle and high schools. In addition to the comprehensive travel plan, <br />the scope of services included: <br />• Replacement of 1,100 feet of existing sidewalk <br />• Design and installation of another 1,500 feet of new sidewalk <br />• ADA compliant ramps <br />• Reconstruction of driveway approaches to provide proper cross slopes meeting <br />ADA requirements <br />Relevant Experience <br />We ’re Ready to Apply What We’ve Learned… <br />Many areas of the Kennedy School (Academy) and its <br />amenities are not accessible due to the lack of ADA <br />compliant curbs or sidewalks altogether. This forces <br />students and families who reside within walking dis- <br />tance to use streets for pedestrian travel. <br /> <br />Just like the SRTS projects for The City of Angola, IN, <br />A&Z will coordinate with school and City personnel to <br />identify areas in need of ramps and sidewalks to im- <br />prove accessibility and ensure safety. <br />Entrances to Kennedy School off N. Olive St. Curb ramps ad missing or are ADA deficient. If this is main entrance for pedestrian <br />traffic, safety features are necessary (pavement markings, signals). <br />...to the SRTS: Kennedy School Project
The URL can be used to link to this page
Your browser does not support the video tag.