My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Safe Roads to School Kennedy School - A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - Safe Roads to School Kennedy School - A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 1:15:30 PM
Creation date
2/14/2023 1:15:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The City of South Bend Safe Routes to School: Kennedy School Des No. 2201237 10 <br />Town of Waterloo, IN: SRTS <br />• Project Cost: Combined $.61 million <br />• A&Z Key Staff: Jamal Anabtawi, PE | Wes Downing | Landon Grogg, EI <br />• Client Contact: Tena Woenker | Town Manager | Town of Waterloo | <br />260-837-7428 <br />Over 5,000 feet of sidewalks were installed throughout the Town of Waterloo. <br />The main purpose of this initiative was to provide safe, accessible paths to school <br />for neighborhood children. Many areas sidewalks were overgrown and dangerous – <br /> not to mention impassable for students with special needs. Additionally, several key <br />locations were missing ADA compliant curb ramps. Construction took place in two phases <br /> addressing two different sections of town. Scope of services included: <br />• Designated school path design <br />• Sidewalk design and installation <br />• ADA compliant curb ramps <br />• Street and pavement markings for crosswalks <br />While sidewalks and ramps are the feature of most safe routes to school projects, <br />crosswalks are also paramount to a successful project. At our site visit, A&Z project <br />engineers noted a lack of pavement markings and signage for students who have <br />to cross the street. Like our project in Waterloo and the other SRTS projects we ’ve <br />done, exploring the best options for crosswalk design and features is part of the <br />process. <br />Relevant Experience <br />We ’re Ready to Apply What We’ve Learned… <br />...to the SRTS: Kennedy School Project <br />Intersection along the project boundary: Bendix Dr. <br />I was both pleased and impressed with the ability of your team to complete a comprehensive study of the existing in- <br />tersection and then prepare design alternatives within only a two-week period just prior to the application deadline. <br />Your employees displayed a positive, can-do attitude, and kept me involved through the process. <br />Please express my thanks to everyone at A & Z Engineering, LLC. <br />DeWayne Nodine | Former Town Manager, Waterloo, IN
The URL can be used to link to this page
Your browser does not support the video tag.