Laserfiche WebLink
i <br />• I <br />ifications or changes in the general scope, extent or <br />• character of the Project desired by OWNER, and upon <br />written authorization from OWNER, ENGINEER shall <br />.proceed with the performance of the services called for <br />in the Prelimi~~ary Design Phase, and shall submit pre- <br />liminary design documents and a revised opinion of <br />probable Total Project Costs ~~ithin the stipulated period <br />indicated in paragraph 3 of Exhibit A "Further Descrip- <br />tion of Basic Engineering Services and Related Mat- <br />ters". <br />4.4. After acceptance by OWNER of the Preliminary <br />Design Phase documents and revised opinion of prob- <br />able Total Project Costs, indicating any specific mod- <br />ifications or changes in the general scope, extent or <br />character of the Project desired by OWNER, and upon <br />written authorization from OWNER, ENGINEER shall <br />proceed with the performance of the services called for <br />in the. Final Design Phase; and shall deliver Contract <br />Documents and a revised opinion of probable Total <br />Project Costs for all work of Contractor(s) on the Proj- <br />ect within the stipulated period indicated in paragraph <br />4 of Exhibit A "Further Description of Basic Engi- <br />neering Services and Related Matters". <br />4.5. ENGINEER's services under the Study and Report <br />Phase, Preliminary Design Phase and Final Design Phase <br />• shall. each be considered complete at the earlier of (1) <br />the date when the submissions for that phase have been <br />accepted by OWNER or (2) thirty days after.the date <br />when such submissions are delivered to OWNER for <br />final acceptance, plus in each case such additional time <br />as may be considered reasonable for obtaining approval <br />of governmental authorities having jurisdiction to <br />approve the design of the Project. <br />4.6. After acceptance by OWNER of the ENGI- <br />NEER's Drawings, Specifications and other Final Design <br />Phase documentation including the most recent opinion <br />of probable Total Project Costs and upon written autho- <br />rization to proceed, ENGINEER shall proceed with <br />performance of the services called for in the Bidding <br />or Negotiating Phase. This Phase shall terminate .and <br />the services to be rendered thereunder shall be consid- <br />ered complete upon commencement of the Construc- <br />tion Phase or upon cessation of negotiations with pro- <br />spective Contractor(s) (except as may otherwise be <br />required to complete the services called for in para- <br />graph 6.,2.2.0. <br />4.7. The Construction Phase will commence with the <br />execution of the first prime contract to be executed for <br />• the work of the Project or any part thereof, and will <br />terminate upon ~~~ritten recommendation by ENGI- <br />\'EER of final payment on the last prime contract to <br />be completed. Construction Phase services maybe ren- <br />dered at different times in respect of separate prime <br />contracts if the Project involves more than one prime <br />contract. <br />4.8. The Operational Phase will commence during the <br />Construction Phase and will terminate one .y_ear after <br />the date of Substantial Completion of the last prime <br />contract for construction; materials and equipment on <br />which substantial completion is achieved. <br />4.9. If O WNER has requested significant modifications <br />or changes in the genera( scope, extent or character of <br />the Project, the time of performance of ENGINEER'S <br />services shall be adjusted equitably. <br />4.10. If OWNER fails to give prompt written authori- <br />zation toproceed with any phase of services after com- <br />pletion of the immediately preceding phase, or if the <br />Construction Phase has not commenced within ~~ <br />.calendar days (plus such additional time as may be <br />required to complete the services called for under para- <br />graph 6.2.2. ~) after completion of the Final Design Phase, <br />ENGINEER may, after giving seven days' written notice <br />to OWNER, suspend services under this Agreement. <br />4.11. If ENGINEER's services for design or during <br />construction of the Project are delayed or suspended <br />in whole or in part by OWNER for more than three <br />months for reasons beyond ENGINEER'S control, <br />ENGINEER shall on written demand to OWNER (but <br />without termination of this Agreement) be paid as pro- <br />vided in paragraph 5.3.2. If such delay or suspension <br />extends for more. than one year for reasons beyond <br />ENGINEER'S control, or if ENGINEER for any rea- <br />son is required to render Construction Phase services <br />in respect of any prime contract for construction, mate- <br />rials or equipment more than one year after Substantial <br />Completion is achieved under that contract, the various <br />rates of compensation provided for elsewhere in this <br />Agreement shall be subject to equitable adjustment. <br />4.12. In the event that the work designed or specified <br />by ENGINEER is to be furnished or performed :under <br />more than one prime contract, or if ENGINEER'S ser- <br />vices are to be separately sequenced with the work of <br />one or more prime contractors (such as in the case of <br />fast-tracking), OWNER and ENGINEER shall, prior <br />to commencement of the Final Design Phase, develop <br />a schedule for performance of ENGINEER'S services <br />during the Final Design. Bidding or Negotiating and <br />Construction Phases in order to sequence and coordi- <br />nate properly such services as are applicable to the <br />work under such separate contracts. This schedule is <br />Page 9 of 1 pages. <br />