Laserfiche WebLink
.,, ~- <br />C. Limitations of Authority <br />Resident Project Rcprescntati~e: <br />I. Shall not authorize any deviation from the Contract Uu~uments or suhstitution of materials or equipment, <br /> unless authorized by ENGINEEK. <br />'_'. Shallnot exceed limitations of ENGINEER'S authority. as set forth in the Agreement or the Contract <br /> Documents. <br />3. Shall not undertake any of the responsibilities of`CONTRACTOR, subcontractors or CONTRACTOR'S'" <br /> superintendent. <br />4. Shall not advise on, issue directions relative to or assume control over any aspect of the means, methods, <br /> techniques, sequences or procedures of construction unless such advice or directions are specifically <br /> required by the Contract Documents. <br />5. Shall not advise on, issue directions regarding or assume control over safety precautions and programs in <br /> connection with the Work. <br />6. Shall not accept Shop Drawing or sample submittals from anyone other than CONTRACTOR. <br />7. Shall not authorize OWNER to occupy the Project in whole or in part. <br />8. Shall not participate in specialized field or laboratory tests or inspections conducted by others except as <br /> specifically authorized by ENGINEER. <br /> <br />x <br />3of3 <br />