Laserfiche WebLink
<br /> <br /> <br />responsit~ilitics assigned to and tihcfertaken by <br />ENGINEER durinc the Cunsh-uction Phase, and, iri <br />addition, by exercise of ENGINEER'S efforts as an <br />experienced and qualified design professional, to pro- <br />vide for OWNER a greater degree of confidence that <br />.the completed work of Contractor(s) will conform <br />_ _ .... generally _to the Contract Documents. and that the .. <br />integrity of the design concept as reflected in the <br />Contract Documents has been implemented and pre- <br />served by Contractor{s). On the other hand, ENGI- <br />NEER shall not, during such visits or as a result of <br />such observationsof Contractor(s)' work in progress, <br />- supervise, direct or have control over Contractor(s)' <br />work nor shall ENGINEER have authority over or <br />responsibility for the means, methods, techniques, <br />sequences or procedures of construction selected by <br />Contractor(s), for safety precautions and programs <br />incident to the work of Contractor(s) or for any failure <br />of Contractor(s) to comply with laws, rules, regula- <br />lions, ordinances, codes or orders applicable to Con- <br />tractor(s) furnishing and performing their work. <br />Accordingly, ENGINEER can neither guarantee the <br />performance of the construction contracts by Con- <br />- tractor(s) nor assume responsibility for Contrac- <br />tor(n)' failure to furnish and perform their work in <br />accordance with the Contract Documents. <br />1.6.3. Defective Work. During such visits and on the <br />basis of such observations, ENGINEER may disap- <br />prove of or reject Contractor(s)' work while it is in <br />progress if ENGINEER believes that such work will <br />not produce a completed Project that conforms gen- <br />erally to the Contract Documents or that it will preju- <br />dice the integrity of the design concept of the Project <br />as reflected in the Contract Documents: <br />1.6.4. Interpretations and Clarifications. ENGINEER <br />shall issue necessary interpretations and clarifications <br />of the Contract Documents and in connection therewith <br />prepare work directive changes and change orders as <br />required. <br />] .6.5. Shop Drawings. ENGINEER shall review and <br />approve (or take other appropriate action in respect of) <br />Shop Drawings. (as that term is defined in the aforesaid <br />Standard General Conditions), samples and other data <br />which Contractor(s) are required to submit, but only <br />for conformance with the design concept of the Project <br />and compliance with the information given in the Con- <br />tract Documents. Such reviews and approvals or other <br />action shall not extend to means, methods, techniques, <br />sequences or procedw-es of construction or to safety <br />precautions and programs incident thereto. <br />].6.6. Srrbstitutes. ENGINEER shall evaluate and <br />determine the acceptability of substitute materials and <br />ryuipmc.it proposed by Cuntractor(sl, but subject to <br />the provision of paragraph 2.2.2. <br />1.6.7. lnspc~ction.e «rrd Tests. ENGINEER shall have <br />authority, as Oti'NER's representative, to require spe- <br />cial inspection or testing of the work, and shall receive <br />and review all certific~ies.of inspections, testings and ., <br />approvals required by laws, rules, regulations, ordi- <br />nances, codes, orders or the Contract Documents (but <br />only to determine generally that their content. complies <br />with the requirements of, and the results certified indi- <br />cate compliance with, the Contract Documents). <br />1.6.8, Dispcetes between OWNER and Contractor.. <br />ENGINEER shall act as initial interpreter of the <br />requirements of the Contract Documents and judge of <br />.the acceptability of the work thereunder and make deci- <br />sions on all claims of OWNER and Contractor(s) relat- <br />ing tothe acceptability of the work or the interpretation <br />of the requirements of the Contract Documents per- <br />taining to the execution and progress of the work. <br />ENGINEER shall not be liable for the. results of any <br />~such.interpretations or decisions. rendered in good faith. <br />1.6.9. Applications for Payment. Based on ENGI- <br />NEER'S on-site observations as an experienced and <br />qualified design. professional, on information provided <br />by the Resident Project Representative and on review <br />of applications for payment and the accompanying data <br />and schedules: <br />1.6.9.1.. ENGINEER shall determine the amounts <br />owing to Contractor(s) and recommend in writing <br />payments to Contractor(s) in such amounts. Such <br />recommendations of payment will constitute a rep- <br />resentation to OWNER, based on such observations <br />and review, that the work has progressed to the point <br />indicated, and that, to the best of ENGINEER'S <br />knowledge, information and belief, the quality of <br />such work. is generally in accordance with the Con- <br />tract Documents .(subject to an evaluation of such <br />work as a functioning whole. prior"to or upon Sub- <br />stantial Completion, to the results of any subsequent <br />tests called for in the Contract Documents and to any <br />other qualifications stated in the recommendation). <br />In the case of unit price work, ENGINEER'S rec- <br />ommendations of payment will include final deter- <br />minations of quantities and classifications of such <br />work (subject to any subsequent adjustments allowed <br />by the Contract Documents). <br />1.6.9.2. By recommending any payment ENGI- <br />NEER will not thereby be deemed to have repre- <br />sented that exhaustive, continuous or detailed reviews <br />or examinations have been made by ENG]NEER to <br />check the quality or quantity of Contractor(s)' work <br />Page 4 of _l9- pages <br />