Laserfiche WebLink
1.2.3. Identify and analyze requirements of t;rwcrn- I.3.3. Advise OWN [:R i1 additional d~-ta or services <br />• mental authorities having ,jurisdiction to approve the of the types desrrihed in paragraph 3.4 are necessary <br />design of the I'rc~ject and participate in consultations and assist OWN ER in obtaining such data and services. <br />with such authorities. <br />4. Provide analyses of OWNER's needs, plan <br />~ys, site.. evaluations and comparative studie <br />~•n~ctive sites and solutions. <br />.2.5. Pr vide a general economic analysis~eff OWN- <br />:R's requt ements applicable to various a ernatives, <br />.2.6. Prepar <br />ketches and <br />to exhibits to <br />Report containing schp4natic layouts,' <br />ceptual design crite 'a with appropri-' <br />i~c~te clearly the con 'derations involved' <br />Including applica <br />uthorities having <br />requireme s of governmental <br />indiction aforesaid) and the <br />able o OWNER and setting <br />rs d recommendations. This <br />by ENGINEER's opinion <br />j t, including the following <br />temr ed: Construction Cost, <br />costs d contingencies, and <br />:ion fur 'shed by OWNER) <br />ernative solutions a~ <br />Rh ENGINEER'S find <br />;port will be accompa <br />probable costs for the <br />rich will be separatel <br />owance for eneinee~ <br />on the basis of i <br />Ilowances for su other items as arges of all other <br />rofessionals an consultants, for th cost of land and <br />'ghts-of--way, or compensation for r damages to <br />roperties, f interest and financing ch rges and for <br />they servi es to be provided by others or Owner <br />~ursuant .paragraphs 3.7 through 3.11, incl ive. The <br />otal of 1 such costs, allowances, etc. are he inafter <br />~alled `Total Project Costs". <br />. Furnish five copies of the Study and Report ~ <br />-ts and review them in person with OWNER. <br />duties and responsibilities of ENGINEER during <br />Study and Report Phase are amended and supple- <br />nted as indicated in paragraph Z of Exhibit A "Fur- <br />r Descriptions of Basic Engineering Services and <br />1.3. Preliminary Design Phase. <br />After written authorization to proceed with the Prelim- <br />inary Design Phase, ENGINEER shall: <br />1.3.1. In consultation with OWNER and on the basis <br />of the accepted Study and Report documents, deter- <br />mine the general scope, extent and character of the <br />Project. <br />• <br />1.3?. Prepare Preliminary Design documents consist- <br />ing offinal design criteria, preliminary drawings, outline <br />specifications and written descriptions of the Project. <br />1.3.4. Based on the information. contained in the pre- <br />liminary design documents, submit a revised opinion <br />_- _ of probable Total Project Costs. . <br />1.3.5. Furnish five copies of the above Preliminary <br />Design documents and present and review them in per- <br />son with OWNER. <br />The duties and responsibilities of ENGINEER during <br />the Preliminary Design Phase. are amended and sup- <br />plemented as indicated in paragraph 3 of Exhibit A <br />"Further Description of Basic Engineering Services <br />and Related Matters". <br />1.4. Final Design Phase. <br />After written authorization to proceed with the Final <br />Design Phase, ENGINEER shall: <br />1.4.I. On the basis of the accepted Preliminary Design <br />documents and the revised opinion of probable Total <br />Project Costs prepare for incorporation in the Contract <br />Documents final drawings to show the general scope, <br />extent and character of the work to be furnished and <br />performed by Contractor(s) thereinafter called "Draw- <br />ings") and Specifications (which will be prepared in <br />conformance with the sixteen division. format of the <br />Construction Specifications Institute). <br />1.4.2. Provide technical criteria, written descriptions <br />and design data for OWNER'S use in filing applications <br />for permits with or obtaining approvals of such gov- <br />ernmental authorities as have. jurisdiction to approve <br />the design of the Project, and assist OWNER in con- <br />sultations with appropriate authorities. <br />1.4.3. Advise OWNER of any adjustments to the latest <br />opinion of probable Total Project Costs caused by <br />changes in genera] scope, extent or character or design <br />requirements of the Project or Construction Costs. Fur- <br />nish to OWNER a revised opinion of probable Total <br />Project Costs based on the Drawings and Specifica- <br />tions. <br />1.4.4. Prepare for review and approval by OWNER, <br />its legal counsel and other advisors contract agreement <br />forms. general conditions and supplementary condi- <br />tions, and (where appropriate) bid forms, invitations to <br />bid and instructions to bidders tall of which shall be <br />consistent with the forms and pertinent guide ,heels <br />P~~~~• ~ ~~r 19 _ ~~~« <br />