Laserfiche WebLink
,. .,~' . <br />s <br />'.Y <br />I <br />August 10, 1990 <br />.City of South Bend <br />Redevelopment Commission ment <br />C/0 Department of Economic Develop <br />RE: Proposal for Professional Services <br />Internal Circulation Roads <br />Airport 2010 Master Plan <br />page -2- <br />Pre are a Statement of Probable tonasrmany itemstasopossiblereet <br />C. P <br />construction work broken down in plans prepared for the <br />This estimate will be based on. Preliminary otable <br />streets and will include StatemensanitarybsewerCservicet~Pn Cost <br />for the streets, storm drainage, rotection and street <br />water service, fire hydrants for fire p <br />lighting. <br />in the Scope of Services above, may be included <br />Any work not outlined <br />.-. u on receipt of instructions frog the~Owner and such work wil e <br />• s" and will be paid for on an hourly <br />~_ considered as "Additional Servic <br />rate basis as described in-this Proposal/Agreement. <br />• OWNER'S RESPONSIBILITY <br />The Owner will be responsible for.. resentative <br />Designating in writing a person to act as Owner's rep <br />1. <br />with respect to the servhceersonbshalldhave.complete1authodef neo <br />Proposal/Agreement. .Suc p <br />transmit instructions~eCeseons withrrespect to therEnganeer's <br />Owner's policies and <br />services for the project. <br />Furnish the Engineer copies of the aerial survey and maps <br />2° lan development. The aerial survey should include <br />suitable for p <br />ground control,. sneer to <br />3, Arrange for access to anavatee~ ropertyvas} requi~edEfor the nt. <br />enter upon public and pri p reeme <br />Engineer to .perform the services under this Proposal/Ag <br /> <br />