My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 5 to PSA - Beck’s Lake Remediation Work – Jones Petrie Rafinski Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 5 to PSA - Beck’s Lake Remediation Work – Jones Petrie Rafinski Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 1:19:23 PM
Creation date
1/24/2023 1:19:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/24/2023
Rectangle
ID:
1
Creator:
Created:
1/24/2023 1:19 PM
Modified:
1/24/2023 1:19 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work and Cost Proposal for Beck’s Lake NPL/LaSalle Park Area <br />December 22, 2022 <br />Page 1 of 3 <br /> <br /> <br /> <br /> <br /> <br />December 22, 2022 <br /> <br /> <br />City of South Bend <br />Legal Department <br />227 West Jefferson Boulevard #1200 <br />South Bend, Indiana 46601 <br />Attn: Sandra Kennedy, <br /> Corporation Counsel <br /> <br />RE: SCOPE OF WORK CHANGES AND COST ADJUSTMENTS, BECK’S LAKE NPL <br />SITE/LASALLE PARK AREA, SOUTH BEND, INDIANA <br /> (PROJECT 2018-0225) <br /> <br />Dear Ms. Sandra Kennedy: <br /> <br />Jones Petrie Rafinski Corp. (JPR) is pleased to submit this Scope of Work Changes and Cost <br />Adjustments as a fifth amendment to the original professional services agreement (PSA) dated August <br />14, 2018 for work associated with additional offsite waste delineation (Task 1), groundwater investigation <br />(Task 2), soil management plan (SMP) implementation (Task 3), general consulting services (Task 4) <br />and soil sampling to define Areas of Concern (Task 5) for the Beck’s Lake NPL Site/LaSalle Park Area <br />project. <br /> <br />SCOPE OF WORK CHANGES BY TASK WITH COST ADJUSTMENTS <br /> <br />Task 1: Waste Delineation Outside of the LaSalle Park Area (LPA) - North of Linden Avenue <br />Net Task Change: None. <br /> <br />Task 2: Monitor Well Installation, Development, and Groundwater Sampling <br />Net Task Change: None. <br /> <br />Task 3: Soil Management Plan Implementation and Oversight of Waste Soil Disposal <br />Net Task Change: $42,650.20 increase. <br /> <br />The City of South Bend had approved the “Contract Documents and Specifications for Beck’s <br />Lake/LaSalle Park” (Project No. 120-053) which is the bid package for implementing the Time-Critical <br />Removal Actions (TCRA) related to multiple areas of the Beck’s Lake/Lasalle Park NPL Site as <br />required by the EPA. The approved activities included sod, soil, and tree removal as well as the <br />placement of additional fill sand and topsoil. The field work related to the TCRA was completed on <br />December 21, 2022. However, additional renovations to the Beck’s Lake/LaSalle Park are planned <br />for the near future. As per the EPA-approved Soil Management Plan (SMP), the air must be <br />monitored for particulate contaminants of concern (COCs) during any soil disturbance at the site. Any <br />soil excavated must be removed from the site and transported directly to an EPA-approved landfill <br />for proper disposal. In addition, all soil brought to the site must be determined to be free of COCs via <br />laboratory analytical testing (at concentrations above regulatory limits) prior to placement on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.