My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Main Street Improvements between Dean & Sherwood Proj No. 122-04 - Milestone Contractors North, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - Main Street Improvements between Dean & Sherwood Proj No. 122-04 - Milestone Contractors North, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 3:47:32 PM
Creation date
1/10/2023 1:54:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wages for the above listed Zones shall be as follows: <br />Effective Zone 1 Zone 1A <br />4/I/2022 — 3/31/2023 <br />$32.57 <br />$32.22 <br />4/1/2023 — 3/31/2024 <br />TBD <br />TBD <br />4/l/2024 — 3/31/2025 <br />TBD <br />T13D <br />4/1/2025 — 3/31/2026 <br />TBD <br />TBD <br />4/1/2026 — 3/31/2027 <br />TBD <br />TBD <br />The Union and the Employer agree that all Journeymen will be required to complete a <br />minimum of 20 hours of skills upgrade training every two (2) years. <br />CATEGORY I shall include the following and be paid the basic rate. <br />Construction Laborer <br />Carpenter Tender <br />Dingos <br />Fence Erector <br />Flagman <br />Grade Checker <br />Guard Rail Erector <br />Continuous Steel Rod or Mat Installer <br />Wire Mesh Layer <br />Joint Man (Mortar, Mastic, and all other types) <br />Lighting installer (Permanent or Temporary) <br />Lineman for Automatic Grade Maker on Paving Machine <br />Mortar Man <br />Multi -Gang Drill <br />Multi -Plate Erector <br />Remote -controlled Walk Behind Trench Rollers <br />Rip -Rap Installer (All products and materials) <br />Road Marking and Delineation Laborer <br />Rodman and Chainman <br />Setting and Placing of all Precast Concrete Products <br />Sign Installation, including supporting structure <br />Spraying, Rolling, Brushing of all Surface Sealers, Epoxies, Masonry Coatings, <br />Curing Compounds, Cure and Seal products and other like materials on <br />all surfaces, along with the surface preparation required <br />Survey Crew Man <br />Sod Layer <br />Air Tool, Power Tool, and Power Equipment Operator <br />Asphalt Lute Man <br />Asphalt Raker Man <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.