Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name:Ironwood Dr, & Ireland Rd. Intersection Improvements <br />Project No.:22-1089 <br />Manhour Justification Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObserverAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />6.1 Construction Outline Preparation 8 920$ <br />6.2 Coordination with IDEM 8 920$ <br />6.3 Notice of Intent Permit Requirements 8 1.5 1,040$ <br />Task 7 Bid Phase Services 0 16 7 7 0 0 0 0 0 30 3,920$ <br />7.0 Attend Pre-bid Meeting 4 560$ <br />7.1 Issue Addenda, If needed 4 3 3 1,280$ <br />7.2 Review and tabulate bids and make recommendations to Town 8 4 4 2,080$ <br />Task 8 Construction Administration Phase 0 0 20 0 0 0 0 0 0 20 2,500$ <br />8.0 Construction Admin 20 2,500$ <br />Totals 16 135 403 385 0 0 1.5 0 0 940.5 $116,630 <br />Labor Summary <br />Task Description Total Hrs Total Fee <br />Task 1 Topographic Survey 0 0 2 24 0 0 2 36 12 76 11,270$ <br />Task 2 Preliminary Design (30%-50%)16 44 142 164 0 0 0 0 0 366 45,730$ <br />Task 3 Final Design (100%)0 56 180 172 0 0 0 0 0 408 50,120$ <br />Task 4 Traffic Signal Design 8 24 44 84 0 0 0 0 0 160 20,000$ <br />Task 5 Utility (8 Utility Companies)0 17 54 2 0 0 0 0 0 73 9,360$ <br />Task 6 Permits - IDEM Construction Stormwater General Permit 0 2 0 40 0 0 1.5 0 0 44 5,000$ <br />Task 7 Bid Phase Services 0 16 7 7 0 0 0 0 0 30 3,920$ <br />Task 8 Construction Administration Phase 0 0 20 0 0 0 0 0 0 20 2,500$ <br />Hour Totals 24 159 449 493 0 0 3.5 36 12 1177 147,900$ <br />Labor Rate 185.00 140.00 125.00 115.00 105.00 95.00 80.00 180.00 135.00 <br />Labor Cost 4,440$ 22,260$ 56,125$ 56,695$ -$ -$ 280$ 6,480$ 1,620$ 147,900$ <br />Labor Multiplier 1.000 <br />Labor Total 4,440$ 22,260$ 56,125$ 56,695$ -$ -$ 280$ 6,480$ 1,620$ 147,900$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Ironwood Dr. & Ireland Rd. Intersection Fee NT.xlsx 3 of 4